Back to Facilities
Operational

Sterling CyrusOne 023 (NVA1)

CyrusOne

Sterling, United States

Sterling CyrusOne 023 is a data centre operated by CyrusOne in Sterling, United States, in the Northern Virginia market. The site is operational, with 48 MW of live capacity.

Status
Operational
Operator
CyrusOne
Location
Sterling, United States
Market
Northern Virginia
Live capacity
48 MW

Coordinates

Position

39.026, -77.4144

Location precision

Exact

History

  1. Industry milestone

    ENR names Northern Virginia Sterling II a Manufacturing Best Project

    Engineering News-Record named the Northern Virginia Sterling II data centre a Best Project in its Manufacturing category, citing delivery of the two-storey, 22.5 MW, 225,000 sq ft greenfield facility in 180 days.

    Source: enr.com

  2. Industry milestone

    Project Goliath 180-day build reported as an industry construction record

    Trade coverage of Project Goliath — Sterling buildings 2 and 3, some 220,000 sq ft — described the 180-day build time as breaking industry construction records for a data centre of that scale.

    Source: electricalalliance.org

  3. Commissioning

    Third Sterling building opens, adding 130,000 sq ft

    CyrusOne opened a third building on the Sterling campus in August 2016, a 130,000 sq ft facility completing the NVA1-NVA3 group.

    Source: datacenterfrontier.com

  4. Commissioning

    Sterling II commissioned 180 days after groundbreaking

    CyrusOne completed and commissioned Sterling II in 180 days — reported at the time as the shortest delivery interval for an enterprise-scale data centre of its size. Engineering News-Record records the building as two-storey, 22.5 MW and 225,000 sq ft, including fit-out and commissioning of 160,000 sq ft of data hall space and MEP galleries. DataCenterDynamics reported the capacity as 30 MW; the two figures disagree and both are recorded here rather than reconciled.

    Source: enr.com

  5. Prelease

    Sterling II fully pre-leased at 30 MW ahead of completion

    Data Center Frontier describes Sterling II as "a fully pre-leased 30 megawatt data center" completed in early 2016 — the whole building spoken for before it opened. Note the capacity disagreement carried on this facility: Engineering News-Record records the same building as 22.5 MW. Both figures are on the record and neither has been reconciled away.

    Source: datacenterfrontier.com

  6. Groundbreaking

    CyrusOne breaks ground on Sterling II at its Northern Virginia campus

    Construction began on Sterling II, a two-storey greenfield data centre on CyrusOne's Northern Virginia campus in Sterling, built with the company's "massively modular" method. The build ran 180 days end to end; the exact start date is not stated in any retrievable source, so this is carried at month precision.

    Source: datacenterdynamics.com

  7. Commissioning

    CyrusOne enters the Northern Virginia market with Sterling I

    Sterling I brought CyrusOne into the Northern Virginia market in 2015, the first building on what became the NVA1-NVA3 campus in Loudoun County. The source states the year only.

    Source: datacenterfrontier.com

Questions about Sterling CyrusOne 023

Who operates Sterling CyrusOne 023?
Sterling CyrusOne 023 is operated by CyrusOne.
Where is Sterling CyrusOne 023?
Sterling CyrusOne 023 is in Sterling, United States, in the Northern Virginia data centre market.
Is Sterling CyrusOne 023 operational?
Yes. DC Atlas records Sterling CyrusOne 023 as operational.
How much power capacity does Sterling CyrusOne 023 have?
DC Atlas records 48 MW as Sterling CyrusOne 023's live capacity.

Beyond the location

DC Atlas tracks the grid connection behind data centres across 65 countries — who supplies the power, the market it sits in, and what is being built next.

Sign up free