Sterling CyrusOne 023 (NVA1)
Sterling CyrusOne 023 is a data centre operated by CyrusOne in Sterling, United States, in the Northern Virginia market. The site is operational, with 48 MW of live capacity.
- Status
- Operational
- Operator
- CyrusOne
- Location
- Sterling, United States
- Market
- Northern Virginia
- Live capacity
- 48 MW
Coordinates
Position
39.026, -77.4144
Location precision
Exact
History
ENR names Northern Virginia Sterling II a Manufacturing Best Project
Engineering News-Record named the Northern Virginia Sterling II data centre a Best Project in its Manufacturing category, citing delivery of the two-storey, 22.5 MW, 225,000 sq ft greenfield facility in 180 days.
Source: enr.com
Project Goliath 180-day build reported as an industry construction record
Trade coverage of Project Goliath — Sterling buildings 2 and 3, some 220,000 sq ft — described the 180-day build time as breaking industry construction records for a data centre of that scale.
Source: electricalalliance.org
Third Sterling building opens, adding 130,000 sq ft
CyrusOne opened a third building on the Sterling campus in August 2016, a 130,000 sq ft facility completing the NVA1-NVA3 group.
Source: datacenterfrontier.com
Sterling II commissioned 180 days after groundbreaking
CyrusOne completed and commissioned Sterling II in 180 days — reported at the time as the shortest delivery interval for an enterprise-scale data centre of its size. Engineering News-Record records the building as two-storey, 22.5 MW and 225,000 sq ft, including fit-out and commissioning of 160,000 sq ft of data hall space and MEP galleries. DataCenterDynamics reported the capacity as 30 MW; the two figures disagree and both are recorded here rather than reconciled.
Source: enr.com
Sterling II fully pre-leased at 30 MW ahead of completion
Data Center Frontier describes Sterling II as "a fully pre-leased 30 megawatt data center" completed in early 2016 — the whole building spoken for before it opened. Note the capacity disagreement carried on this facility: Engineering News-Record records the same building as 22.5 MW. Both figures are on the record and neither has been reconciled away.
Source: datacenterfrontier.com
CyrusOne breaks ground on Sterling II at its Northern Virginia campus
Construction began on Sterling II, a two-storey greenfield data centre on CyrusOne's Northern Virginia campus in Sterling, built with the company's "massively modular" method. The build ran 180 days end to end; the exact start date is not stated in any retrievable source, so this is carried at month precision.
Source: datacenterdynamics.com
CyrusOne enters the Northern Virginia market with Sterling I
Sterling I brought CyrusOne into the Northern Virginia market in 2015, the first building on what became the NVA1-NVA3 campus in Loudoun County. The source states the year only.
Source: datacenterfrontier.com
Questions about Sterling CyrusOne 023
- Who operates Sterling CyrusOne 023?
- Sterling CyrusOne 023 is operated by CyrusOne.
- Where is Sterling CyrusOne 023?
- Sterling CyrusOne 023 is in Sterling, United States, in the Northern Virginia data centre market.
- Is Sterling CyrusOne 023 operational?
- Yes. DC Atlas records Sterling CyrusOne 023 as operational.
- How much power capacity does Sterling CyrusOne 023 have?
- DC Atlas records 48 MW as Sterling CyrusOne 023's live capacity.
Beyond the location
DC Atlas tracks the grid connection behind data centres across 65 countries — who supplies the power, the market it sits in, and what is being built next.
Sign up freeOther data centres in Northern Virginia
View the Northern Virginia marketReston 365 044
365 Data Centers
Reston 365 024
365 Data Centers
Ashburn Acronis 001
Acronis
Sterling Aligned 011
Aligned
Ashburn Aligned 019
Aligned
Manassas Amazon AWS 139
Amazon
More facilities operated by CyrusOne
CyrusOne profileSterling CyrusOne 037
CyrusOne
Sterling CyrusOne 010
CyrusOne
Sterling CyrusOne 032
CyrusOne
Sterling CyrusOne 006
CyrusOne
West Drayton CyrusOne 001
CyrusOne
Wappingers Falls CyrusOne 034
CyrusOne