Ashburn Equinix 029 (DC15)
Ashburn Equinix 029 is a colocation data centre operated by Equinix in Ashburn, United States, in the Washington, D.C. market. The site is operational, with 14 MW of live capacity.
- Status
- Operational
- Operator
- Equinix
- Location
- Ashburn, United States
- Market
- Washington, D.C.
- Facility type
- Colocation
- Live capacity
- 14 MW
Coordinates
Position
39.0225, -77.4502
Location precision
Exact
History
Ashburn Equinix 029 — entered service
The $111 million first phase of DC15 opened in Q2 2020 with an initial capacity of 1,600 cabinet equivalents and colocation space of approximately 23,000 square feet.
Source: investor.equinix.com
Ashburn Equinix 029 breaks ground
Ashburn Equinix 029 broke ground on 15 October 2015, on a North Ashburn campus site that the source says will eventually make way for five facilities.
Source: investor.equinix.com
Questions about Ashburn Equinix 029
- Who operates Ashburn Equinix 029?
- Ashburn Equinix 029 is operated by Equinix.
- Where is Ashburn Equinix 029?
- Ashburn Equinix 029 is in Ashburn, United States, in the Washington, D.C. data centre market.
- Is Ashburn Equinix 029 operational?
- Yes. DC Atlas records Ashburn Equinix 029 as operational.
- How much power capacity does Ashburn Equinix 029 have?
- DC Atlas records 14 MW as Ashburn Equinix 029's live capacity.
Beyond the location
DC Atlas tracks the grid connection behind data centres across 65 countries — who supplies the power, the market it sits in, and what is being built next.
Sign up freeOther data centres in Washington, D.C.
View the Washington, D.C. marketHerndon 365 046
365 Data Centers
Herndon 365 053
365 Data Centers
Ashburn Equinix 028
Equinix
Ashburn Equinix 057
Equinix
Herndon Equinix 079
Equinix
Ashburn Rackspace 001
Rackspace
More facilities operated by Equinix
Equinix profileAshburn QTS 035
Equinix
Ashburn Equinix 014
Equinix
Ashburn Equinix 021
Equinix
Ashburn Equinix 025
Equinix
Ashburn Equinix 090
Equinix
Ashburn Equinix 002
Equinix