Back to Facilities
Under construction

Eatonville HostDime 003 — est. 20 MW under construction

HostDime

Eatonville, United States

Eatonville HostDime 003 is a data centre operated by HostDime in Eatonville, United States.

Status
Under construction
Operator
HostDime
Location
Eatonville, United States
Under construction
20 MW est.

Figures marked est. are DC Atlas estimates rather than operator-published values.

Coordinates

Position

28.64, -81.39

Location precision

Approximate

Questions about Eatonville HostDime 003

Who operates Eatonville HostDime 003?
Eatonville HostDime 003 is operated by HostDime.
Where is Eatonville HostDime 003?
Eatonville HostDime 003 is in Eatonville, United States.
Is Eatonville HostDime 003 operational?
Not yet. Eatonville HostDime 003 has been announced and is not recorded as operational.
How much power capacity does Eatonville HostDime 003 have?
DC Atlas records 20 MW as Eatonville HostDime 003's under construction. That figure is a DC Atlas estimate rather than an operator-published value.

Beyond the location

DC Atlas tracks the grid connection behind data centres across 65 countries — who supplies the power, the market it sits in, and what is being built next.

Sign up free