Back to Facilities
OperationalHyperscale

Cumming Microsoft Azure 008 — 8 MW live

Microsoft

Cumming, United States

Cumming Microsoft Azure 008 is a hyperscale data centre operated by Microsoft in Cumming, United States. The site is operational, with 8 MW of live capacity.

Status
Operational
Operator
Microsoft
Location
Cumming, United States
Facility type
Hyperscale
Live capacity
8 MW

Coordinates

Position

41.5, -93.79

Location precision

Approximate

History

  1. Permit approved

    Cumming Microsoft Azure 008 — permit approved

    in December the company was issued a permit valued at $255 million for a data center at 5855 SW Kerry St

    Source: datacenterdynamics.com

  2. Announcement

    Cumming Microsoft Azure 008 — announced

    The SW Kerry Street site, also known as Project Osmium was announced in 2016

    Source: datacenterdynamics.com

Questions about Cumming Microsoft Azure 008

Who operates Cumming Microsoft Azure 008?
Cumming Microsoft Azure 008 is operated by Microsoft.
Where is Cumming Microsoft Azure 008?
Cumming Microsoft Azure 008 is in Cumming, United States.
Is Cumming Microsoft Azure 008 operational?
Yes. DC Atlas records Cumming Microsoft Azure 008 as operational.
How much power capacity does Cumming Microsoft Azure 008 have?
DC Atlas records 8 MW as Cumming Microsoft Azure 008's live capacity.

Beyond the location

DC Atlas tracks the grid connection behind data centres across 65 countries — who supplies the power, the market it sits in, and what is being built next.

Sign up free