DAMAC Digital

OperatorDeveloper

UAE data-centre business building and operating Tier III scalable data centres, covering site selection through to delivering fully-built facilities, with an AI solutions line and a customer portal.

At a glance

Facilities tracked

4

Markets

4

Countries

4

Live capacity

10+ MW

Pipeline

180+ MW

Total potential

250+ MW

Live capacity is power in service today. Pipeline is under construction plus announced. Total potential counts every megawatt once, including expansion headroom at existing sites.


AE

DAMAC Digital data centre locations

4 mapped sites across 4 countries, coloured by status.

Open DAMAC Digital in the ExplorerFilter, compare and search the live map. Free account, no card.

Embed the DAMAC Digital data center map

Paste this into any page. The map stays live as the data changes, every pin still opens its facility page, and the frame carries a link back to DC Atlas. Free to use, no key needed.

Customise this embedPick a country, market or operator, narrow it by status and type, set the size, and watch the map update as you choose.Open the embed builder

Company Overview

DAMAC Digital facilities

Every DAMAC Digital site with a page on DC Atlas, by market.

BangkokThailand

DammamSaudi Arabia

JakartaIndonesia

MadridSpain

Browse every operator in IndonesiaSaudi ArabiaSpainThailand

Recent Activity

  • CommissionedSep 14, 20264 MW

    Damac Digital and Vodafone inaugurate 4MW data center in Izmir, Turkey

    Damac Digital and Vodafone Türkiye have inaugurated the first phase of a data center facility in Izmir, Turkey, initially delivering 4MW of capacity with plans to scale to 20MW. The facility, built with seismic isolation technology, spans 7,500 sqm and can accommodate 650 racks. The $300 million investment was originally planned in 2024 and completed in 18 months. This is Vodafone's sixth data center in Turkey and its second in Izmir.

  • EnergizedSep 4, 20264 MW

    Vodafone and DAMAC Digital open $100M Izmir data centre

    Vodafone Türkiye and DAMAC Digital opened the first phase of the İzmir Data Centre with a $100 million investment and initial capacity of 4 MW, with plans to expand to 20 MW and $300 million total investment.