Back to Companies

IREN

OperatorNeocloud

IREN builds and operates next-generation data centres designed for AI, High-Performance Computing (HPC), and sustainable compute. They offer AI Cloud solutions, providing access to GPUs and turnkey data centres, or partnering to design and build AI-ready facilities. Their purpose-built data centres are engineered for power-dense, high-performance computing. They are grid-connected for reliable service and powered by 100% renewable energy. IREN focuses on vertical integration, offering flexibility and operational efficiency for demanding AI workloads.

At a glance

Facilities tracked

7

Markets

5

Countries

2

Live capacity

600+ MW

Pipeline

3,600+ MW

Total potential

4,500+ MW

Live capacity is power in service today. Pipeline is under construction plus announced. Total potential counts every megawatt once, including expansion headroom at existing sites.


NASDAQ: IREN

IREN data centre locations

7 mapped sites across 2 countries, coloured by status.

Open IREN in the ExplorerFilter, compare and search the live map. Free account, no card.

Embed the IREN data center map

Paste this into any page. The map stays live as the data changes, every pin still opens its facility page, and the frame carries a link back to DC Atlas. Free to use, no key needed.

Customise this embedPick a country, market or operator, narrow it by status and type, set the size, and watch the map update as you choose.Open the embed builder

Company Overview

Ownership Type

Public

IREN facilities

Every IREN site with a page on DC Atlas, by market.

West TexasUnited States

Canal FlatsCanada

MackenzieCanada

Prince GeorgeCanada

Texas PanhandleUnited States

United States

Browse every operator in CanadaUnited States

Recent Activity

  • Interconnection agreedSep 9, 20262,000 MW

    ERCOT grants conditional Base Load status to IREN's 2 GW Sweetwater Hub in Texas

    IREN announced that the Electric Reliability Council of Texas (ERCOT) has conditionally included its 2 GW Sweetwater Hub in West Texas as Base Load under ERCOT's new Batch Zero interconnection process. The Sweetwater Hub comprises two sites: Sweetwater 1 on 1,700 acres with 1,400 MW expected capacity, and Sweetwater 2 on 500 acres with 600 MW capacity. IREN energized a high-voltage substation at Sweetwater 1 earlier in 2026, with 300 MW of data-centre capacity expected by Q4 2027. Batch Zero is ERCOT's new approval process for large electricity users requesting 75 MW or more, designed to assess feasibility, allocate capacity, and identify needed transmission upgrades; as of June 2026, nearly 89% of ERCOT's 438,000 MW of tracked large load requests are from data centres.

  • CommissionedAug 17, 2026

    Iren delivers first phase of AI capacity to Microsoft in Texas

    Iren has delivered the first phase of AI capacity to Microsoft at a facility in Texas.

Premium Data Locked

Upgrade to access capacity metrics, financial data, portfolio details, and strategic intelligence

Sign up free