IREN
IREN builds and operates next-generation data centres designed for AI, High-Performance Computing (HPC), and sustainable compute. They offer AI Cloud solutions, providing access to GPUs and turnkey data centres, or partnering to design and build AI-ready facilities. Their purpose-built data centres are engineered for power-dense, high-performance computing. They are grid-connected for reliable service and powered by 100% renewable energy. IREN focuses on vertical integration, offering flexibility and operational efficiency for demanding AI workloads.
At a glance
Facilities tracked
7
Markets
5
Countries
2
Live capacity
600+ MW
Pipeline
3,600+ MW
Total potential
4,500+ MW
Live capacity is power in service today. Pipeline is under construction plus announced. Total potential counts every megawatt once, including expansion headroom at existing sites.
IREN data centre locations
7 mapped sites across 2 countries, coloured by status.
Company Overview
Ownership Type
Public
Website
Visit WebsiteIREN facilities
Every IREN site with a page on DC Atlas, by market.
West TexasUnited States
- Fisher County IREN 001Fisher County · Under construction
- Sweetwater IREN 001Sweetwater · Under construction
Canal FlatsCanada
- Canal Flats IREN 001Canal Flats · Operational
MackenzieCanada
- Mackenzie IREN 001Mackenzie · Operational
Prince GeorgeCanada
- Prince George IREN 001Prince George · Operational
Texas PanhandleUnited States
- Childress IREN 001Childress · Operational
United States
- IREN Oklahoma Data Center CampusUndisclosed · Announced
Browse every operator in CanadaUnited States
Recent Activity
ERCOT grants conditional Base Load status to IREN's 2 GW Sweetwater Hub in Texas
IREN announced that the Electric Reliability Council of Texas (ERCOT) has conditionally included its 2 GW Sweetwater Hub in West Texas as Base Load under ERCOT's new Batch Zero interconnection process. The Sweetwater Hub comprises two sites: Sweetwater 1 on 1,700 acres with 1,400 MW expected capacity, and Sweetwater 2 on 500 acres with 600 MW capacity. IREN energized a high-voltage substation at Sweetwater 1 earlier in 2026, with 300 MW of data-centre capacity expected by Q4 2027. Batch Zero is ERCOT's new approval process for large electricity users requesting 75 MW or more, designed to assess feasibility, allocate capacity, and identify needed transmission upgrades; as of June 2026, nearly 89% of ERCOT's 438,000 MW of tracked large load requests are from data centres.
Iren delivers first phase of AI capacity to Microsoft in Texas
Iren has delivered the first phase of AI capacity to Microsoft at a facility in Texas.