Back to Companies

Metrobloks

Operator

Metrobloks develops and operates low-latency colocation data centres in metro areas. They focus on providing infrastructure for hyperscalers and enterprises, positioning compute closer to users for improved performance in underserved markets. They offer single-tenant and multi-tenant colocation services, alongside interconnectivity solutions. Their facilities are designed with modularity and scalability, supporting high-density rack configurations and flexible cooling technologies for AI and cloud workloads.

At a glance

Facilities tracked

6

Markets

6

Countries

2

Live capacity

100+ MW

Pipeline

250+ MW

Total potential

350+ MW

100% of live capacity and 18% of pipeline are estimated rather than sourced.

Live capacity is power in service today. Pipeline is under construction plus announced. Total potential counts every megawatt once, including expansion headroom at existing sites.


US

Metrobloks data centre locations

6 mapped sites across 2 countries, coloured by status.

Open Metrobloks in the ExplorerFilter, compare and search the live map. Free account, no card.

Embed the Metrobloks data center map

Paste this into any page. The map stays live as the data changes, every pin still opens its facility page, and the frame carries a link back to DC Atlas. Free to use, no key needed.

Customise this embedPick a country, market or operator, narrow it by status and type, set the size, and watch the map update as you choose.Open the embed builder

Company Overview

Metrobloks facilities

Every Metrobloks site with a page on DC Atlas, by market.

DetroitUnited States

GibbstownUnited States

IndianapolisUnited States

MiamiUnited States

ParisFrance

PhoenixUnited States

Browse every operator in FranceUnited States

Recent Activity

  • AnnouncedFeb 12, 2026350 MW

    Soluna Announces 350MW AI Campus Development at Project Kati 2

    Soluna Holdings announced January 2026 operational updates including engineering plans for a 350MW AI/HPC campus at Project Kati 2 in partnership with Metrobloks, spread across 7 buildings on 500+ acres. The company also reported progress on multiple projects: Project Kati 1 (83MW Bitcoin hosting) achieved ERCOT energization approval with power commissioning underway, while existing facilities (Dorothy 1A, 1B, 2, Sophie) continue operations with customer deployments ongoing. Key partnerships with Siemens and Metrobloks were announced to address GPU power volatility and unlock capacity.

Premium Data Locked

Upgrade to access capacity metrics, financial data, portfolio details, and strategic intelligence

Sign up free