Back to Facilities
Under constructionHyperscale

Smeaton Grange Amazon AWS 003 — 40 MW under construction

Amazon

Smeaton Grange, Australia

Smeaton Grange Amazon AWS 003 is a hyperscale data centre operated by Amazon in Smeaton Grange, Australia, in the Sydney market.

Status
Under construction
Operator
Amazon
Location
Smeaton Grange, Australia
Market
Sydney
Facility type
Hyperscale
Under construction
40 MW

Coordinates

Position

-34.03, 150.77

Location precision

Approximate

History

  1. Announcement

    Smeaton Grange Amazon AWS 003 — announced

    Smeaton Grange Amazon AWS 003 was announced on 5 May 2023.

    Source: api.apps1.nsw.gov.au

Questions about Smeaton Grange Amazon AWS 003

Who operates Smeaton Grange Amazon AWS 003?
Smeaton Grange Amazon AWS 003 is operated by Amazon.
Where is Smeaton Grange Amazon AWS 003?
Smeaton Grange Amazon AWS 003 is in Smeaton Grange, Australia, in the Sydney data centre market.
Is Smeaton Grange Amazon AWS 003 operational?
Not yet. Smeaton Grange Amazon AWS 003 has been announced and is not recorded as operational.
How much power capacity does Smeaton Grange Amazon AWS 003 have?
DC Atlas records 40 MW as Smeaton Grange Amazon AWS 003's under construction.

Beyond the location

DC Atlas tracks the grid connection behind data centres across 65 countries — who supplies the power, the market it sits in, and what is being built next.

Sign up free