Country
Australia: 169 data centres, 36 operators, 2,221 MW live
There are 169 data centres in Australia, across 38 markets, 36 operators, 140 operational, 2,221 MW live (0% modelled), 5,899 MW total potential. Largest by total potential: CDC Data Centres (12 sites), then NEXTDC.
Map of 160 data centres in Australia
Every Australia site DC Atlas tracks with a position on record, coloured by status.
Australia is one scope of the whole corpus. See every facility DC Atlas tracks on the global data center map.
Live
2,221MW
0% modelled
Under construction
1,980MW
Planned
1,343MW
Total potential
5,899MW
8% of pipeline modelled
Who supplies the power
98% of the data centres we track in Australia have a named power supplier
- Ausgrid33sites
- Energex22sites
- Endeavour Energy22sites
- Essential Energy13sites
- CitiPower13sites
- SA Power Networks13sites
7 further suppliers serve smaller numbers of sites here.
Who is building in Australia
The 10 largest operators here by total potential, of 36 tracked in this country.
| Operator | Sites | Live | Total potential |
|---|---|---|---|
| CDC Data Centres | 12 | 327 MW | 1,620 MW |
| NEXTDC | 16 | 549 MW | 1,099 MW |
| AirTrunk | 5 | 435 MW | 840 MW |
| STACK Infrastructure | 6 | 100 MW | 574 MW |
| Microsoft | 6 | 59 MW | 565 MW |
| Equinix | 25 | 201 MW | 205 MW |
| Amazon | 7 | 90 MW | 190 MW |
| DigiCo Infrastructure REIT | 11 | 56 MW | 183 MW |
| DCI Data Centers | 8 | 53 MW | 133 MW |
| Macquarie Data Centres | 6 | 50 MW | 95 MW |
When Australia was built
1,825 MW of the live capacity here carries a commissioning date — 67% of the operational sites in this country.
Recent activity
88 recorded developments in Australia, the latest on 1 Jan 2027.
Application filed for 200 MW data centre in Melbourne, Australia
An application has been filed for a 200 MW data centre in Melbourne, Australia.
Zerra lodges development application for 1.44GW Queensland data centre campus
Singapore-based data centre developer Zerra DC, through project company WDDP Pty Ltd, has lodged a development application with Western Downs Regional Council for the Western Downs Digital Park, a 1.44GW data centre campus planned for a 725.5-hectare site near Dalby, Queensland. The project proposes four 360MW buildings delivered in four stages, with construction costs estimated at AUD 14.5bn (AUD 16bn including GST) and an expected construction period of four to six years. The site was selected for proximity to high-voltage transmission infrastructure and nearby gas-fired power stations. Once operational, the campus is forecast to generate approximately 1,400 direct jobs and AUD 760m in annual gross value added to Queensland.
Plans filed for 10-story data center outside Brisbane
Plans have been filed for a 10-story data center to be built outside Brisbane, Australia.
DXN to supply prefabricated modular data center to Melbourne Airport
Australia's DXN announced it will supply a prefabricated modular data center to Melbourne Airport.
GreenSquare expands into Melbourne with 240MW campus
GreenSquare announced an expansion into Melbourne with a 240MW data centre campus.
Victoria's data centre pipeline grows with four new Melbourne proposals
Victoria's data centre development pipeline has expanded with four major proposals across Melbourne's northern, western, and south-eastern regions. The announcements reflect the Victorian Government's strategy to position the state as a destination for AI infrastructure investment. The activity demonstrates growing commercial interest in establishing data centre capacity in Victoria to support emerging artificial intelligence workloads.
AU$1.1 billion data center project proposed outside Melbourne
A new data center project valued at AU$1.1 billion has been proposed for a location outside Melbourne, Australia. The project represents a significant investment in data center infrastructure for the region. Details regarding the developer, timeline, and capacity were not disclosed in the available text. This announcement reflects continued growth in Australian data center investment.
Coretora plans fibre corridor to expand Melbourne data centre zone
Coretora, a new Australian fibre infrastructure developer, has announced plans for a carrier-grade fibre corridor connecting areas south of Geelong to Melbourne's western data centre availability zone. The project aims to extend connectivity into Victoria's high-energy growth region to support AI and hyperscale workloads. This infrastructure will provide high-capacity links for data centre operators in the expanded Melbourne region.
Who is hiring in Australia
49 open data centre roles at 4 operators we track
4 operators are recruiting in Australia, 49 roles in total, the largest of them CDC Data Centres at 18. The split is 26 build-side to 23 operational, with critical facilities (13) and construction (7) the two largest disciplines. More than half of them, 25 of the 49, were posted in the last 30 days.
- CDC Data Centres18roles
- Firmus12roles
- STACK Infrastructure12roles
- AirTrunk7roles
The mix
- critical facilities13
- construction7
- design and engineering7
- project management6
- security6
- commissioning3
- development and land3
- energy and utilities3
- network1
The roles behind those numbers
Most recently opened
- STACK Infrastructurecommissioning22 Sept 2026
- CDC Data Centressecurity19 Sept 2026
- CDC Data Centresconstruction18 Sept 2026
- CDC Data Centresconstruction18 Sept 2026
- AirTrunkdevelopment and land13 Sept 2026
Counted from the operators' own public careers feeds, read daily. A role counts here when the employer runs a data centre we track and the work is operational rather than back office. What these roles involve, and what they pay.
Questions about Australia
- How many data centres are there in Australia?
- There are 169 data centres in Australia, across 38 markets, 36 operators, 140 operational, 2,221 MW live (0% modelled), 5,899 MW total potential. Largest by total potential: CDC Data Centres (12 sites), then NEXTDC.
- How much data centre capacity does Australia have?
- DC Atlas tracks 169 data centres in Australia. 2,221 MW is live, 1,980 MW is under construction, 1,343 MW is planned, for 5,899 MW of total potential at full buildout.
- Who are the largest data centre operators in Australia?
- 36 operators run facilities in Australia. CDC Data Centres is the largest by total potential, with 12 sites and 1,620 MW.
- Which utilities supply power to data centres in Australia?
- Ausgrid, Energex and Endeavour Energy serve the most data centre sites in Australia. DC Atlas holds a named power supplier for 98% of the facilities it tracks here.
Every data centre we track in Australia
164 of 169 with a published page