Perth: 12 data centres, 6 operators, 224 MW planned
Perth, Australia has 12 data centres on the DC Atlas map, spanning 3 sub-markets, run by 6 operators, 9 operational, 224 MW planned. Largest by total potential: CDC Data Centres (1 site), then NEXTDC.
Map of 12 data centres in Perth
Every Perth site DC Atlas tracks with a position on record, coloured by status.
Perth is one scope of the whole corpus. See every facility DC Atlas tracks on the global data center map.
Live
40MW
7% modelled
Under construction
0MW
Planned
224MW
Total potential
264MW
Who supplies the power
100% of the data centres we track in the Perth market have a named power supplier
- Western Power12sites
Who is building in Perth
The 6 largest operators here by total potential, of 6 tracked in this market.
| Operator | Sites | Live | Total potential |
|---|---|---|---|
| CDC Data Centres | 1 | — | 200 MW |
| NEXTDC | 2 | 26 MW | 26 MW |
| STACK Infrastructure | 2 | — | 24 MW |
| Equinix | 4 | 6.3 MW | 6.3 MW |
| Fujitsu Cloud | 1 | 5 MW | 5 MW |
| Vocus | 2 | 2.8 MW | 2.8 MW |
When Perth was built
34 MW of the live capacity here carries a commissioning date — 67% of the operational sites in this market.
Recent activity
6 recorded developments in the Perth market, the latest on 13 Jul 2026.
Vocus-occupied data center outside Perth, Australia, sold
A 1MW data center facility located in Perth, Australia, previously occupied by Vocus, has been sold for AU$13.13m (US$9.1m) to an unnamed UK-based investment group.
Mandoon Bilya AI data centre proposal cancelled after Indigenous opposition
A proposed 120-megawatt AI data centre at Mandoon Bilya (Helena River) near Perth was cancelled in May 2026 after a community campaign led by the Bibbul Ngarma Aboriginal Association. The site, which contains Aboriginal heritage and supports local water systems, is now focused on ecological restoration. The article frames the cancellation as part of a broader policy debate over Indigenous participation in decisions about AI infrastructure siting in Australia.
Shenton Park Equinix 020 commissioned
Shenton Park Equinix 020 came into service in 2021; the source refers to it as PE3 phase I.
Shenton Park Equinix 020 expansion
Shenton Park Equinix 020 was expanded in 2019, with the source referring to this as PE2 phase II.
East Perth Telstra InfraCo 002 ownership change
East Perth Telstra InfraCo 002 changed ownership on 18 April 2018 as part of a transaction in which the acquisition of Metronode, which operated the facility, was completed.
Shenton Park Equinix 009 ownership change
Shenton Park Equinix 009 changed ownership on 18 April 2018 as part of a transaction that added two data centers to Equinix's portfolio in the Sydney area, intended to meet demand for dual sites for redundancy.
Questions about Perth
- How many data centres are in Perth?
- Perth, Australia has 12 data centres on the DC Atlas map, spanning 3 sub-markets, run by 6 operators, 9 operational, 224 MW planned. Largest by total potential: CDC Data Centres (1 site), then NEXTDC.
- How much data centre capacity does Perth have?
- DC Atlas tracks 12 data centres in the Perth data centre market. 40 MW is live, 224 MW is planned, for 264 MW of total potential at full buildout.
- Who are the largest data centre operators in Perth?
- 6 operators run facilities in the Perth data centre market. CDC Data Centres is the largest by total potential, with 1 site and 200 MW.
- Which utilities supply power to data centres in Perth?
- Western Power serve the most data centre sites in the Perth data centre market. DC Atlas holds a named power supplier for 100% of the facilities it tracks here.
Every data centre we track in Perth
12 facilities