Under constructionHyperscale

Ellendale CoreWeave 001 — 400 MW under construction

CoreWeave

Ellendale, United States

Ellendale CoreWeave 001 is a hyperscale data centre operated by CoreWeave in Ellendale, United States, in the Ellendale (South Dakota border) market.

Who operates Ellendale CoreWeave 001?
CoreWeave.
Where is Ellendale CoreWeave 001?
Ellendale, United States, in the Ellendale (South Dakota border) market.
What is the capacity of Ellendale CoreWeave 001?
400 MW under construction.

Project tracker

400 MW under construction

Construction figure, unverified: no source on record has been checked against a second.

400 MW under construction in the Ellendale (South Dakota border) market, which has 400 MW of total potential at full buildout and none of it live yet.

The market today · Ellendale (South Dakota border)

Under construction
400 MW
Total potential
400 MW

Timeline

  1. Announcement

    Ellendale CoreWeave 001 — announced

    DALLAS, June 02, 2025 (GLOBE NEWSWIRE) -- Applied Digital Corporation (Nasdaq: APLD), a designer, builder and operator of next-generation digital infrastructure for HPC applications, has entered into two approximately 15-year lease agreements with CoreWeave, the AI Hyperscaler™. Under the lease agreements, Applied Digital will deliver 250 megawatts (MW) of critical IT load to host CoreWeave's artificial intelligence (AI) and high-performance computing (HPC) infrastructure at its Ellendale, North Dakota data center campus. Over the approximately 15-year term, Applied Digital anticipates generating approximately $7 billion in total revenue from the leases.

    Source: ir.applieddigital.com

  2. Commissioning

    Ellendale CoreWeave 001 — entered service

    DALLAS, Nov. 24, 2025 (GLOBE NEWSWIRE) -- Applied Digital (NASDAQ: APLD) today announced the successful and on-time Ready for Service (RFS) for the second phase (50 MW) at the first 100 megawatt (MW) building at Building 1 of its Polaris Forge 1 AI Factory Campus in Ellendale, North Dakota. After achieving this milestone, Building 1 now operates at its full 100 MW critical IT load, marking the completion of the first of three contracted buildings at the campus.

    Source: ir.applieddigital.com

  3. Commissioning

    Ellendale CoreWeave 001 — entered service

    DALLAS, July 01, 2026 (GLOBE NEWSWIRE) -- Applied Digital (NASDAQ: APLD), a designer, builder, and operator of high-performance, sustainably engineered data centers and colocation services for artificial intelligence, cloud, networking, and blockchain workloads, today announced it has achieved Ready for Service for Phase 1 of Building 2 at Polaris Forge 1, delivering 75 MW of operational AI capacity to its customer on schedule and bringing total live capacity at the campus to 175 MW.

    Source: ir.applieddigital.com

Also announced or under construction by CoreWeave

Coordinates

Position

46, -98.53

Location precision

Approximate

Beyond the location

DC Atlas tracks the grid connection behind data centres across 65 countries — who supplies the power, the market it sits in, and what is being built next.

Sign up free