Bulgaria: 20 data centres, 12 operators, 29 MW live
There are 20 data centres in Bulgaria, across 5 markets, 12 operators, 19 operational, 29 MW live (17% modelled), 32 MW total potential. Largest by total potential: ITD Networks (2 sites), then Telepoint.
Map of 19 data centres in Bulgaria
Every Bulgaria site DC Atlas tracks with a position on record, coloured by status.
Bulgaria is one scope of the whole corpus. See every facility DC Atlas tracks on the global data center map.
Live
29MW
17% modelled
Under construction
0MW
Planned
2.4MW
Total potential
32MW
Who supplies the power
100% of the data centres we track in Bulgaria have a named power supplier
- Electrohold20sites
Who is building in Bulgaria
The 10 largest operators here by total potential, of 12 tracked in this country.
| Operator | Sites | Live | Total potential |
|---|---|---|---|
| ITD Networks | 2 | 6 MW | 6 MW |
| Telepoint | 3 | 5.8 MW | 5.8 MW |
| Equinix | 2 | 5.6 MW | 5.6 MW |
| Neterra Telecommunications | 3 | 4.1 MW | 4.1 MW |
| Top Systems Data Centers | 1 | — | 2.4 MW |
| S3 Company Ltd. | 1 | 2 MW | 2 MW |
| M247 | 1 | 2 MW | 2 MW |
| A1 Bulgaria | 2 | 1.4 MW | 1.4 MW |
| Yettel Bulgaria | 1 | 1.2 MW | 1.2 MW |
| Claro | 1 | 0.6 MW | 0.6 MW |
When Bulgaria was built
12 MW of the live capacity here carries a commissioning date — 47% of the operational sites in this country.
Recent activity
1 recorded developments in Bulgaria, the latest on 30 Jul 2026.
Sofia Equinix 001 expansion
Sofia Equinix 001 was expanded on 20 July 2023, when Equinix announced the commissioning of the second phase of its second data center in Bulgaria, SO2.2.
Sofia Equinix 001 announced
Sofia Equinix 001 was announced on 4 October 2018, when the company said it would open its second Bulgarian IBX data center, called SO2, in Sofia at a cost of $19 million; the source notes an opening planned for Q1 2019.
Questions about Bulgaria
- How many data centres are there in Bulgaria?
- There are 20 data centres in Bulgaria, across 5 markets, 12 operators, 19 operational, 29 MW live (17% modelled), 32 MW total potential. Largest by total potential: ITD Networks (2 sites), then Telepoint.
- How much data centre capacity does Bulgaria have?
- DC Atlas tracks 20 data centres in Bulgaria. 29 MW is live, 2.4 MW is planned, for 32 MW of total potential at full buildout.
- Who are the largest data centre operators in Bulgaria?
- 12 operators run facilities in Bulgaria. ITD Networks is the largest by total potential, with 2 sites and 6 MW.
- Which utilities supply power to data centres in Bulgaria?
- Electrohold serve the most data centre sites in Bulgaria. DC Atlas holds a named power supplier for 100% of the facilities it tracks here.
Every data centre we track in Bulgaria
20 facilities
Sofia17
- Plovdiv Equinix 002
- Sofia Claro 003
- Sofia Claro 004
- Sofia Claro 005
- Sofia Claro 006
- Sofia Equinix 001
- Sofia Evolink AD 001
- Sofia Evolink AD 002
- Sofia ITD Networks 002
- Sofia Kyndryl 001
- Sofia M247 Global 001
- Sofia Neterra Telecommunications 003
- Sofia Neterra Telecommunications 004
- Sofia S3 Company 001
- Sofia Telepoint 001
- Sofia Telepoint 003
- Vlado Trichkov ITD Networks 001