Chachoengsao DAMAC Group 001 — 200 MW announced
DAMAC Group (EDGNEX)
Chachoengsao DAMAC Group 001 is a hyperscale data centre operated by DAMAC Group (EDGNEX) in Undisclosed, Thailand, in the Chachoengsao market. The site has been announced and is not yet operational, with 200 MW of announced capacity.
- Who operates Chachoengsao DAMAC Group 001?
- DAMAC Group (EDGNEX).
- Where is Chachoengsao DAMAC Group 001?
- Undisclosed, Thailand, in the Chachoengsao market.
- Is Chachoengsao DAMAC Group 001 operational?
- Not yet, Chachoengsao DAMAC Group 001 has been announced and is not recorded as operational.
- What is the capacity of Chachoengsao DAMAC Group 001?
- 200 MW announced.
Project tracker
200 MW announced
Announced figure, unverified: no source on record has been checked against a second.
200 MW announced in the Chachoengsao market, which has 200 MW of total potential at full buildout and none of it live yet.
The market today · Chachoengsao
- Planned
- 200 MW
- Total potential
- 200 MW
Timeline
Chachoengsao DAMAC Group 001 — permit approved
Another approved project is a ฿46 billion ($1.4 billion; £1 billion) data centre investment by Skyline Data Center and Cloud Services, part of the UAE-based DAMAC Group. Located in Chachoengsao, the project will support an IT load of 200MW.
Source: dcnnmagazine.com
Coordinates
Position
13.55, 101.62
Location precision
Approximate
Beyond the location
DC Atlas tracks the grid connection behind data centres across 65 countries — who supplies the power, the market it sits in, and what is being built next.
Sign up free