Pincher Creek Gryphon Digital Mining 001 — 130 MW announced
Gryphon Digital Mining
Pincher Creek Gryphon Digital Mining 001 is a hyperscale data centre operated by Gryphon Digital Mining in Pincher Creek, Canada. The site has been announced and is not yet operational, with 130 MW of announced capacity.
- Who operates Pincher Creek Gryphon Digital Mining 001?
- Gryphon Digital Mining.
- Where is Pincher Creek Gryphon Digital Mining 001?
- Pincher Creek, Canada.
- Is Pincher Creek Gryphon Digital Mining 001 operational?
- Not yet, Pincher Creek Gryphon Digital Mining 001 has been announced and is not recorded as operational.
- What is the capacity of Pincher Creek Gryphon Digital Mining 001?
- 130 MW announced.
Project tracker
130 MW announced
Announced figure, unverified: no source on record has been checked against a second.
130 MW announced in the Pincher Creek (Alberta) market, which has 130 MW of total potential at full buildout and none of it live yet.
The market today · Pincher Creek (Alberta)
- Planned
- 130 MW
- Total potential
- 130 MW
Timeline
Pincher Creek Gryphon Digital Mining 001 — announced
Gryphon announced its intent to execute on Captus’s plans to develop a natural gas-fired power plant with carbon capture and storage (CCS), producing clean electricity to power AI computing infrastructure to be built on-site.
Source: captusgeneration.com
Pincher Creek Gryphon Digital Mining 001 — changed ownership
As a result, Gryphon Digital Mining, Inc (GRYP) underwent a one-for-five (1-5) reverse stock split along with a change of corporate name, symbol and CUSIP number.
Source: nasdaqtrader.com
Coordinates
Position
49.48, -113.94
Location precision
Approximate
Beyond the location
DC Atlas tracks the grid connection behind data centres across 65 countries — who supplies the power, the market it sits in, and what is being built next.
Sign up free