Market
Lisbon: 7 sites, 5 operators, 360 MW under construction
Lisbon, Portugal has 7 data centres, 4 operational, spanning 3 sub-markets, 5 operators, 32 MW live (15% modelled), 360 MW under construction. Edged Energy alone accounts for 2 sites, ahead of AtlasEdge.
Map of 7 data centres in Lisbon
Every Lisbon site DC Atlas tracks with a position on record, coloured by status.
Lisbon is one scope of the whole corpus. See every facility DC Atlas tracks on the global data center map.
Live
32MW
15% modelled
Under construction
360MW
Planned
24MW
Total potential
416MW
47% of pipeline modelled
Who supplies the power
100% of the data centres we track in the Lisbon market have a named power supplier
- E-REDES6sites
- E-REDES & REN1site
Who is building in Lisbon
The 5 largest operators here by total potential, of 5 tracked in this market.
| Operator | Sites | Live | Total potential |
|---|---|---|---|
| Edged Energy | 2 | — | 360 MW |
| AtlasEdge | 2 | 5.1 MW | 29 MW |
| Equinix | 1 | 21 MW | 21 MW |
| Claranet | 1 | 5 MW | 5 MW |
| Grupo Aire | 1 | 1.5 MW | 1.5 MW |
Only 50% of the live facilities here carry a commissioning date across too few years, which is too thin to chart as a build history.
Recent activity
4 recorded developments in the Lisbon market, the latest on 31 Oct 2028.
University of Lisbon invests €20M in two sovereign cloud datacenters
Universidade de Lisboa is investing over €20 million to build two new datacenters across its Oeiras and Cidade Universitária campuses as part of a sovereign cloud infrastructure project for scientific research. The project is developed collaboratively by IST, Faculty of Sciences, GIMM, and the university's rectory. Construction is expected to complete by October 2028. This initiative aims to create independent cloud computing capacity for the Portuguese scientific community.
Portugal's Data Center Market Poised for Growth, Valued at US$3.89 Billion by 2026-2031
Portugal's data center market is projected to reach US$3.89 billion between 2026 and 2031. Key players are investing in renewable energy and AI infrastructure, with Lisbon emerging as a preferred location.
Lisbon Equinix 001 announced
Lisbon Equinix 001 was announced on 4 June 2024; the source states it will be located adjacent to Equinix's existing LS1 site, forming a campus.
Lisbon Equinix 001 ownership change
Lisbon Equinix 001 changed ownership as part of a transaction on 10 October 2017, when the purchase of Itconic was announced as closed.
Who is hiring in Lisbon
7 open data centre roles at 1 operator we track
Start Campus is the only operator recruiting in Lisbon, with 7 roles open across 4 disciplines. The split is 4 build-side to 3 operational, with design and engineering (4) and critical facilities (1) the two largest disciplines. 2 of the 7 were posted in the last 30 days.
- Start Campus7roles
The mix
- design and engineering4
- critical facilities1
- energy and utilities1
- security1
The roles behind those numbers
Most recently opened
- Start Campussecurity21 Sept 2026
- Start Campusenergy and utilities21 Sept 2026
- Start Campuscritical facilities20 Jul 2026
- Start Campusdesign and engineering14 Jul 2026
- Start Campusdesign and engineering3 Jun 2026
Counted from the operators' own public careers feeds, read daily. A role counts here when the employer runs a data centre we track and the work is operational rather than back office. What these roles involve, and what they pay.
Questions about Lisbon
- How many data centres are in Lisbon?
- Lisbon, Portugal has 7 data centres, 4 operational, spanning 3 sub-markets, 5 operators, 32 MW live (15% modelled), 360 MW under construction. Edged Energy alone accounts for 2 sites, ahead of AtlasEdge.
- How much data centre capacity does Lisbon have?
- DC Atlas tracks 7 data centres in the Lisbon data centre market. 32 MW is live, 360 MW is under construction, 24 MW is planned, for 416 MW of total potential at full buildout.
- Who are the largest data centre operators in Lisbon?
- 5 operators run facilities in the Lisbon data centre market. Edged Energy is the largest by total potential, with 2 sites and 360 MW.
- Which utilities supply power to data centres in Lisbon?
- E-REDES and E-REDES & REN serve the most data centre sites in the Lisbon data centre market. DC Atlas holds a named power supplier for 100% of the facilities it tracks here.
Every data centre we track in Lisbon
7 facilities