Warsaw: 31 data centres, 19 operators, 356 MW live
There are 31 data centres in Warsaw, Poland, spanning 4 sub-markets, 19 operators, 29 operational, 356 MW live (23% modelled), 483 MW total potential. Largest by total potential: Switch (1 site), then Data4.
Map of 28 data centres in Warsaw
Every Warsaw site DC Atlas tracks with a position on record, coloured by status.
Warsaw is one scope of the whole corpus. See every facility DC Atlas tracks on the global data center map.
Live
356MW
23% modelled
Under construction
17MW
Planned
100MW
Total potential
483MW
Who supplies the power
100% of the data centres we track in the Warsaw market have a named power supplier
- Stoen Operator25sites
- Innogy4sites
- Innogy Polska1site
- Vattenfall1site
Who is building in Warsaw
The 10 largest operators here by total potential, of 19 tracked in this market.
| Operator | Sites | Live | Total potential |
|---|---|---|---|
| Switch | 1 | — | 100 MW |
| Data4 | 1 | 60 MW | 60 MW |
| Microsoft | 1 | 60 MW | 60 MW |
| Vantage Data Centers | 1 | 48 MW | 48 MW |
| Krypt | 1 | 48 MW | 48 MW |
| Atman | 3 | 43 MW | 43 MW |
| EdgeConnex | 3 | 36 MW | 36 MW |
| Adgar | 3 | — | 17 MW |
| Scaleway | 2 | 15 MW | 15 MW |
| Netia | 2 | 4.5 MW | 15 MW |
When Warsaw was built
186 MW of the live capacity here carries a commissioning date — 45% of the operational sites in this market.
Recent activity
3 recorded developments in the Warsaw market, the latest on 9 Oct 2023.
Warsaw Equinix 004 expansion
Warsaw Equinix 004 was expanded on 9 October 2023; the source records that connectivity into GPW's platform in Equinix WA2 is available via over 30 network service providers.
Warsaw Equinix 001 expansion
Warsaw Equinix 001 was expanded on 9 October 2023; the source notes that connectivity into GPW's platform in Equinix WA2 is available via over 30 network service providers.
Warsaw Equinix 002 commissioned
Warsaw Equinix 002 came into service on 12 March 2020, opening as its third International Business Exchange (IBX) data center in Warsaw under the name WA3; the source notes the investment was announced in November 2019.
Questions about Warsaw
- How many data centres are in Warsaw?
- There are 31 data centres in Warsaw, Poland, spanning 4 sub-markets, 19 operators, 29 operational, 356 MW live (23% modelled), 483 MW total potential. Largest by total potential: Switch (1 site), then Data4.
- How much data centre capacity does Warsaw have?
- DC Atlas tracks 31 data centres in the Warsaw data centre market. 356 MW is live, 17 MW is under construction, 100 MW is planned, for 483 MW of total potential at full buildout.
- Who are the largest data centre operators in Warsaw?
- 19 operators run facilities in the Warsaw data centre market. Switch is the largest by total potential, with 1 site and 100 MW.
- Which utilities supply power to data centres in Warsaw?
- Stoen Operator, Innogy and Innogy Polska serve the most data centre sites in the Warsaw data centre market. DC Atlas holds a named power supplier for 100% of the facilities it tracks here.
Every data centre we track in Warsaw
29 of 31 with a published page