General Trias PLDT 001 — 100 MW announced
PLDT
General Trias PLDT 001 is a hyperscale data centre operated by PLDT in General Trias, Philippines. The site has been announced and is not yet operational, with 100 MW of announced capacity.
- Who operates General Trias PLDT 001?
- PLDT.
- Where is General Trias PLDT 001?
- General Trias, Philippines.
- Is General Trias PLDT 001 operational?
- Not yet, General Trias PLDT 001 has been announced and is not recorded as operational.
- What is the capacity of General Trias PLDT 001?
- 100 MW announced.
Project tracker
100 MW announced
Announced figure, unverified: no source on record has been checked against a second.
100 MW announced in the Manila market, which has 110 MW live today, 120 MW planned and 249 MW of total potential at full buildout.
The market today · Manila
- Live
- 110 MW
- Planned
- 120 MW
- Total potential
- 249 MW17% of pipeline modelled
Timeline
General Trias PLDT 001 — announced
Manila, Philippines [22 June 2023]
Source: vitrodc.com
General Trias PLDT 001 — announced
We confirm the statements cited in the above news article.
Source: sec.gov
Coordinates
Position
14.38, 120.88
Location precision
Approximate
Beyond the location
DC Atlas tracks the grid connection behind data centres across 65 countries — who supplies the power, the market it sits in, and what is being built next.
Sign up free