Country
Poland: 67 data centres, 29 operators, 567 MW live
There are 67 data centres in Poland, across 12 markets, 29 operators, 65 operational, 567 MW live (19% modelled), 728 MW total potential. Largest by total potential: Switch (1 site), then Atman.
Map of 61 data centres in Poland
Every Poland site DC Atlas tracks with a position on record, coloured by status.
Poland is one scope of the whole corpus. See every facility DC Atlas tracks on the global data center map.
Live
567MW
19% modelled
Under construction
17MW
Planned
100MW
Total potential
728MW
Who supplies the power
78% of the data centres we track in Poland have a named power supplier
- Stoen Operator25sites
- Tauron Dystrybucja21sites
- Innogy4sites
- Innogy Polska1site
- Vattenfall1site
Who is building in Poland
The 10 largest operators here by total potential, of 29 tracked in this country.
| Operator | Sites | Live | Total potential |
|---|---|---|---|
| Switch | 1 | — | 100 MW |
| Atman | 5 | 57 MW | 78 MW |
| Data4 | 1 | 60 MW | 60 MW |
| Microsoft | 1 | 60 MW | 60 MW |
| Vantage Data Centers | 1 | 48 MW | 48 MW |
| Krypt | 1 | 48 MW | 48 MW |
| Beyond.pl | 3 | 48 MW | 48 MW |
| S-NET | 6 | 36 MW | 40 MW |
| EdgeConnex | 3 | 36 MW | 36 MW |
| T-Mobile Polska | 4 | 21 MW | 30 MW |
When Poland was built
354 MW of the live capacity here carries a commissioning date — 58% of the operational sites in this country.
Recent activity
10 recorded developments in Poland, the latest on 19 Sept 2026.
Citylink to supply waste heat from data center to Wrocław district heating network
Citylink will supply waste heat from data center servers to the district heating network in Wrocław, Poland.
Warsaw Equinix 004 expansion
Warsaw Equinix 004 was expanded on 9 October 2023; the source records that connectivity into GPW's platform in Equinix WA2 is available via over 30 network service providers.
Warsaw Equinix 001 expansion
Warsaw Equinix 001 was expanded on 9 October 2023; the source notes that connectivity into GPW's platform in Equinix WA2 is available via over 30 network service providers.
Warsaw Equinix 002 commissioned
Warsaw Equinix 002 came into service on 12 March 2020, opening as its third International Business Exchange (IBX) data center in Warsaw under the name WA3; the source notes the investment was announced in November 2019.
Questions about Poland
- How many data centres are there in Poland?
- There are 67 data centres in Poland, across 12 markets, 29 operators, 65 operational, 567 MW live (19% modelled), 728 MW total potential. Largest by total potential: Switch (1 site), then Atman.
- How much data centre capacity does Poland have?
- DC Atlas tracks 67 data centres in Poland. 567 MW is live, 17 MW is under construction, 100 MW is planned, for 728 MW of total potential at full buildout.
- Who are the largest data centre operators in Poland?
- 29 operators run facilities in Poland. Switch is the largest by total potential, with 1 site and 100 MW.
- Which utilities supply power to data centres in Poland?
- Stoen Operator, Tauron Dystrybucja and Innogy serve the most data centre sites in Poland. DC Atlas holds a named power supplier for 78% of the facilities it tracks here.
Every data centre we track in Poland
62 of 67 with a published page
Warsaw22
- Karlovy Vary 7 Atman 001
- Warsaw Adgar 001
- Warsaw Adgar 002
- Warsaw Adgar 003
- Warsaw Atman 001
- Warsaw Atman 002
- Warsaw EdgeConnex 001
- Warsaw EdgeConnex 002
- Warsaw EdgeConnex 003
- Warsaw Equinix 001
- Warsaw Equinix 002
- Warsaw Equinix 003
- Warsaw Equinix 004
- Warsaw Krypt 001
- Warsaw Microsoft Azure 001
- Warsaw Play 002
- Warsaw Scaleway 001
- Warsaw Scaleway 002
- Warsaw Switch 001
- Warsaw T-Mobile Polska 001
- Warsaw Telia 001
- Warsaw Vantage 001