Back to Facilities
Under constructionHyperscale

Osaka EdgeConnex 001 — 350 MW under construction

EdgeConneX

Kyotanabe, Japan

Osaka EdgeConnex 001 is a hyperscale data centre operated by EdgeConneX in Kyotanabe, Japan, in the Osaka market.

Who operates Osaka EdgeConnex 001?
EdgeConneX.
Where is Osaka EdgeConnex 001?
Kyotanabe, Japan, in the Osaka market.
What is the capacity of Osaka EdgeConnex 001?
350 MW under construction.

Project tracker

350 MW under construction

Construction figure, unverified: no source on record has been checked against a second.

350 MW under construction in the Osaka market, which has 593 MW live today, 658 MW under construction, 134 MW planned and 1,550 MW of total potential at full buildout.

The market today · Osaka

Live
593 MW
Under construction
658 MW
Planned
134 MW
Total potential
1,550 MW11% of pipeline modelled

Timeline

  1. Announcement

    Osaka EdgeConnex 001 — announced

    Osaka EdgeConnex 001 was announced on 13 January 2025.

    Source: edgeconnex.com

  2. Groundbreaking

    Osaka EdgeConnex 001 — broke ground

    OSAKA, JAPAN – March 17, 2026 – EdgeConneX, a pioneer in global

    Source: edgeconnex.com

Also announced or under construction by EdgeConneX

Coordinates

Position

34.7, 135.5

Location precision

Approximate

Beyond the location

DC Atlas tracks the grid connection behind data centres across 65 countries — who supplies the power, the market it sits in, and what is being built next.

Sign up free