Country
Japan: 176 sites, 53 operators, 2,834 MW under construction
Japan has 176 data centres, 151 operational, across 28 markets, 53 operators, 1,717 MW live, 2,834 MW under construction. Largest by total potential: Ada Infrastructure (6 sites), then AirTrunk.
Map of 165 data centres in Japan
Every Japan site DC Atlas tracks with a position on record, coloured by status.
Japan is one scope of the whole corpus. See every facility DC Atlas tracks on the global data center map.
Live
1,717MW
Under construction
2,834MW
Planned
534MW
Total potential
5,482MW
8% of pipeline modelled
Who supplies the power
98% of the data centres we track in Japan have a named power supplier
- TEPCO109sites
- Kansai Electric Power48sites
- Hokkaido Electric Power2sites
- Chubu Electric Power2sites
- KEPCO2sites
- Kansai Electric Power Group1site
8 further suppliers serve smaller numbers of sites here.
Who is building in Japan
The 10 largest operators here by total potential, of 53 tracked in this country.
| Operator | Sites | Live | Total potential |
|---|---|---|---|
| Ada Infrastructure | 6 | — | 729 MW |
| AirTrunk | 3 | 410 MW | 430 MW |
| EdgeConnex | 1 | — | 350 MW |
| NTT Global Data Centers | 19 | 150 MW | 307 MW |
| SoftBank Group | 2 | — | 300 MW |
| Digital Edge DC | 16 | 165 MW | 266 MW |
| Equinix | 16 | 157 MW | 157 MW |
| SoftBank Corp | 1 | — | 150 MW |
| Digital Realty | 7 | 136 MW | 136 MW |
| IDC Frontier | 5 | 51 MW | 121 MW |
When Japan was built
1,213 MW of the live capacity here carries a commissioning date — 56% of the operational sites in this country.
Recent activity
38 recorded developments in Japan, the latest on 20 Sept 2026.
Goodman signs 20-year lease with global hyperscaler at Tsukuba Tech Central in Tokyo
Goodman Group has signed a 20-year lease with an unnamed global hyperscale customer for the first 50 MW phase of Tsukuba Tech Central, a planned 1 GW data centre campus in Greater Tokyo. Power will be sourced from TEPCO with dark fibre connections to major interconnection points. The facility is under construction and scheduled to be ready for service in early 2028. Goodman says it is in advanced discussions with customers for subsequent phases at the campus.
NTT, Tokyu Land and Sakura Internet form consortium for Ishikari data center hub
Three Japanese companies—NTT, Tokyu Land, and Sakura Internet—have formed a consortium to develop Ishikari into a major data center hub.
Castrol, WOODMAN and iOLETE announce strategic partnership on next-generation liquid cooling for AI data centres
iOLETE (headquartered in Tokyo, with CEO Akira Shinkai) announced a strategic partnership with Castrol and WOODMAN regarding next-generation liquid cooling and liquid immersion solutions for AI data centres.
GoodVision AI Partners with AI Storm to Build 100 MW AI Factory in Japan
GoodVision AI announced a strategic partnership with Japan-based AI Storm to develop AI inference infrastructure in Japan, starting with a 2 MW liquid-cooled flagship facility in Fukushima expected operational within three months. The phased expansion roadmap targets 20 MW within 12 months and 100 MW across Japan within three years, supported by 50+ reserved sites in Tokyo and surrounding areas. The partnership combines GoodVision's AI infrastructure capabilities with AI Storm's local market presence and enterprise expertise to serve rising enterprise demand for dedicated AI compute capacity.
ITS Communications launches fiber connection service to KDDI Telehouse Shibuya data center
ITS Communications announced July 13 that it has begun offering connection services to KDDI's Telehouse Shibuya data center via optical fiber lines embedded in Tokyo Metro railway infrastructure. The service leverages ITS Communications' fiber optic core rental business along Tokyu railway lines. This interconnection enhances data center accessibility and network redundancy for Tokyo metropolitan area enterprises.
BBIX Opens "BBIX Tokyo 16th Center" at SoftBank Tokyo Fuchu Data Center
BBIX has opened the "BBIX Tokyo 16th Center" within SoftBank's Tokyo Fuchu Data Center. This new facility is located on the 8th floor of the data center.
DigitalBridge and JEXI form Nippon Gateway Infrastructure data center platform in Japan
DigitalBridge and JEXI have launched Nippon Gateway Infrastructure (NGI), a new data center platform in Japan. NGI's initial portfolio includes data center assets acquired from NEC Corporation in the Greater Tokyo and Greater Osaka regions, with NEC remaining a strategic customer.
Tokyo Zenlayer 011 — entered service
Tokyo Zenlayer 011 came into service on 13 March 2025.
Who is hiring in Japan
11 open data centre roles at 1 operator we track
STACK Infrastructure is the only operator recruiting in Japan, with 11 roles open across 6 disciplines. 8 of the 11 are build-side, led by construction at 3. That is the staffing profile of a market putting capacity up rather than running it.
- STACK Infrastructure11roles
The mix
- construction3
- critical facilities2
- design and engineering2
- project management2
- commissioning1
- health and safety1
The roles behind those numbers
Most recently opened
- STACK Infrastructureproject management9 Jul 2026
- STACK Infrastructurecommissioning7 Jul 2026
- STACK Infrastructureproject management19 Jun 2026
- STACK Infrastructuredesign and engineering19 Jun 2026
- STACK Infrastructureconstruction19 Jun 2026
Counted from the operators' own public careers feeds, read daily. A role counts here when the employer runs a data centre we track and the work is operational rather than back office. What these roles involve, and what they pay.
Questions about Japan
- How many data centres are there in Japan?
- Japan has 176 data centres, 151 operational, across 28 markets, 53 operators, 1,717 MW live, 2,834 MW under construction. Largest by total potential: Ada Infrastructure (6 sites), then AirTrunk.
- How much data centre capacity does Japan have?
- DC Atlas tracks 176 data centres in Japan. 1,717 MW is live, 2,834 MW is under construction, 534 MW is planned, for 5,482 MW of total potential at full buildout.
- Who are the largest data centre operators in Japan?
- 53 operators run facilities in Japan. Ada Infrastructure is the largest by total potential, with 6 sites and 729 MW.
- Which utilities supply power to data centres in Japan?
- TEPCO, Kansai Electric Power and Hokkaido Electric Power serve the most data centre sites in Japan. DC Atlas holds a named power supplier for 98% of the facilities it tracks here.
Every data centre we track in Japan
176 facilities
Osaka28
- Chūō-ku Osaka City Telehouse 001
- Osaka ARTERIA Networks 001
- Osaka AT TOKYO 001
- Osaka AT TOKYO 002
- Osaka AT TOKYO 008
- Osaka BroadBand Tower 004
- Osaka CloudHQ 001
- Osaka Colt Data Centre Services 002
- Osaka Digital Edge 001
- Osaka Digital Edge DC 002
- Osaka Equinix 003
- Osaka Equinix 014
- Osaka ESR Group Limited 001
- Osaka IBM Cloud 002
- Osaka IBM Cloud 004
- Osaka Microsoft Azure 001
- Osaka MOD Mission Critical 001
- Osaka NTT Global 002
- Osaka NTT SmartConnect 001
- Osaka NTT SmartConnect 002
- Osaka NTT SmartConnect 003
- Osaka Optage 001
- Osaka Optage 004
- Osaka SCSK 003
- Osaka Singtel 002
- Osaka Telehouse 003
- Osaka TIS 003
- Osaka TIS 004
Tokyo22
- Chuo City IBM Cloud 005
- Tokyo Arteria Networks 001
- Tokyo Arteria Networks 002
- Tokyo Arteria Networks 003
- Tokyo Arteria Networks 004
- Tokyo Atlantic Metro Communications 001
- Tokyo BroadBand Tower 001
- Tokyo Colt Technologies 003
- Tokyo Digital Edge 002
- Tokyo Digital Edge DC 005
- Tokyo Digital Edge DC 013
- Tokyo Equinix 013
- Tokyo IBM Cloud 006
- Tokyo IPTP Networks 001
- Tokyo Marunouchi Direct Access 003
- Tokyo Microsoft Azure 002
- Tokyo NTT Global 001
- Tokyo NTT Global 011
- Tokyo NTT Global 015
- Tokyo Singtel 001
- Tokyo Telstra 001
- Tokyo VPSserver 001