Birmingham / Midlands: 26 data centres, 16 operators, 99 MW live

There are 26 data centres in Birmingham / Midlands, United Kingdom, spanning 12 sub-markets, 16 operators, 24 operational, 99 MW live (31% modelled), 111 MW total potential. Largest by total potential: Veloxserv (3 sites), then nLighten.

Map of 24 data centres in Birmingham / Midlands

Every Birmingham / Midlands site DC Atlas tracks with a position on record, coloured by status.

Open Birmingham / Midlands in the ExplorerFilter, compare and search every facility on the live map. Free account, no card.

Birmingham / Midlands is one scope of the whole corpus. See every facility DC Atlas tracks on the global data center map.

Embed the Birmingham / Midlands data center map

Paste this into any page. The map stays live as the data changes, every pin still opens its facility page, and the frame carries a link back to DC Atlas. Free to use, no key needed.

Customise this embedPick a country, market or operator, narrow it by status and type, set the size, and watch the map update as you choose.Open the embed builder

Live

99MW

31% modelled

Under construction

0MW

Planned

2.5MW

Total potential

111MW

Who supplies the power

85% of the data centres we track in the Birmingham / Midlands market have a named power supplier

  • National Grid Electricity Distribution20sites
  • Alabama Power1site
  • Western Power Distribution1site

Who is building in Birmingham / Midlands

The 10 largest operators here by total potential, of 16 tracked in this market.

OperatorSitesLiveTotal potential
Veloxserv318 MW18 MW
nLighten313 MW13 MW
Suttons Cloud Ltd110 MW10 MW
Serverfarm110 MW10 MW
Santander Data Centers110 MW10 MW
Proximity Data Centres29 MW9 MW
Atos25 MW7.5 MW
Evoque Data Center Solutions17 MW
Node4 Ltd25.5 MW5.5 MW
6 Degrees25 MW5 MW

When Birmingham / Midlands was built

29 MW of the live capacity here carries a commissioning date — 46% of the operational sites in this market.

6 MW1998200120042007201020132016201920222024

Recent activity

10 recorded developments in the Birmingham / Midlands market, the latest on 1 Jul 2026.

  • 1 Jul 2026Permit filed

    EIA screening request filed for Scunthorpe data centre with solar farm

    A planning outline application has been submitted for a data centre development on land east of Normanby Road in Scunthorpe, North Lincolnshire, UK. The project includes data centre buildings, an associated solar farm, and external plant equipment installations. An Environmental Impact Assessment screening request has been filed as part of the planning process. This represents early-stage regulatory engagement for a new data centre facility in the East Midlands region.

  • 1 Nov 2023Acquisition

    Birmingham Lumen 011 ownership change

    Birmingham Lumen 011 changed ownership on 1 November 2023, when Lumen Technologies closed the sale of its European, Middle Eastern, and African business to Colt Technology Services.

  • 20 Nov 2018Permit approved

    Coventry data centre planning permission approved

    Planning permission was approved for a data centre facility in Coventry, UK, along with installation of 6 air conditioning units and 1 generator within an outdoor compound. This represents a resubmission of a previous planning application (FUL/2018/1512). The facility is located on Mitchell Avenue in Coventry. The approval enables construction of the data centre infrastructure.

  • 12 Nov 2018Permit approved

    Newton Data Centre DRUPS System Upgrade Approved in Northampton

    Planning permission was granted for the installation of a new Diesel Rotary Uninterrupted Power Supply (DRUPS) system at the Newton Data Centre in Northampton to support facility upgrades. The project is located at University of Northampton Avenue Campus on St Georges Avenue. This infrastructure upgrade enhances power resilience and operational capacity of the data centre. The approval represents a concrete milestone in the facility's modernization effort.

  • 25 Jul 2018Permit approved

    Peterborough Data Centre Container Facility Planning Permission Approved

    Planning permission was approved for a modular data centre facility in Peterborough, UK, comprising one container, six air conditioning units, and associated equipment housed within a 2.4-metre high palisade fence. The facility is located on land south of a gas compound between Bakewell Road and Orton Parkway in Orton Southgate. This approval represents an incremental expansion of data centre infrastructure in the East Midlands region. The modular design allows for flexible deployment of colocation services.

  • 15 Sept 2005Permit approved

    Sheffield Data Centre Planning Permission Approved

    Planning permission was granted for construction of a single-storey data centre facility on the former Avesta Steelworks site at Shepcote Lane, Sheffield, UK. The development includes both data centre (Sui Generis use) and storage/distribution (B8 use class) components. This represents the conversion of an ex-industrial site for modern digital infrastructure use.

  • 2 Dec 2004Permit approved

    Planning Permission Approved for New IT Data Centre in Derbyshire

    Planning permission was granted for construction of a new IT data centre by Tarmac Central Ltd at Tunstead House in Buxton, Derbyshire. The approval represents a key milestone enabling development of the facility. The location in the East Midlands positions the centre within the UK's established data-centre corridor. This permit approval is a prerequisite step toward physical construction commencement.

  • 29 Sept 2003Permit approved

    Planning Permission Granted for Data Warehouse and NOC in Telford

    Outline planning permission was granted for a two-storey development including a network operations centre and data warehouse facility at Stafford Park in Telford, Shropshire. The project includes associated telecommunications infrastructure. This approval represents a concrete regulatory milestone for data-center development in the UK Midlands during the early 2000s.

All recent activity

Who is hiring in Birmingham / Midlands

1 open data centre role at 1 operator we track

Node4 Ltd is the only operator recruiting in Birmingham / Midlands, with 1 role open across 1 discipline. The single role is network, which runs an estate rather than builds one. It was posted in the last 30 days.

The mix

  • network1

Most recently opened

  • Node4 Ltdnetwork21 Sept 2026

Counted from the operators' own public careers feeds, read daily. A role counts here when the employer runs a data centre we track and the work is operational rather than back office. What these roles involve, and what they pay.

Questions about Birmingham / Midlands

How many data centres are in Birmingham / Midlands?
There are 26 data centres in Birmingham / Midlands, United Kingdom, spanning 12 sub-markets, 16 operators, 24 operational, 99 MW live (31% modelled), 111 MW total potential. Largest by total potential: Veloxserv (3 sites), then nLighten.
How much data centre capacity does Birmingham / Midlands have?
DC Atlas tracks 26 data centres in the Birmingham / Midlands data centre market. 99 MW is live, 2.5 MW is planned, for 111 MW of total potential at full buildout.
Who are the largest data centre operators in Birmingham / Midlands?
16 operators run facilities in the Birmingham / Midlands data centre market. Veloxserv is the largest by total potential, with 3 sites and 18 MW.
Which utilities supply power to data centres in Birmingham / Midlands?
National Grid Electricity Distribution, Alabama Power and Western Power Distribution serve the most data centre sites in the Birmingham / Midlands data centre market. DC Atlas holds a named power supplier for 85% of the facilities it tracks here.

Every data centre we track in Birmingham / Midlands

20 of 26 with a published page