Market
Marseille: 10 data centres, 5 operators, 103 MW live
Marseille, France holds 10 data centres, 5 operators, 103 MW live (10% modelled). Digital Realty alone accounts for 6 sites, ahead of Telehouse.
Map of 10 data centres in Marseille
Every Marseille site DC Atlas tracks with a position on record, coloured by status.
Marseille is one scope of the whole corpus. See every facility DC Atlas tracks on the global data center map.
Live
103MW
10% modelled
Under construction
0MW
Planned
0MW
Total potential
103MW
Who supplies the power
100% of the data centres we track in the Marseille market have a named power supplier
- Enedis8sites
- EDF2sites
Who is building in Marseille
The 5 largest operators here by total potential, of 5 tracked in this market.
| Operator | Sites | Live | Total potential |
|---|---|---|---|
| Digital Realty | 6 | 76 MW | 76 MW |
| Telehouse | 1 | 12 MW | 12 MW |
| BICS | 1 | 10 MW | 10 MW |
| TDF Company | 1 | 2.4 MW | 2.4 MW |
| EXA Infrastructure | 1 | 2 MW | 2 MW |
When Marseille was built
83 MW of the live capacity here carries a commissioning date — 80% of the operational sites in this market.
Recent activity
14 recorded developments in the Marseille market, the latest on 1 Nov 2023.
Marseille Lumen 002 ownership change
Marseille Lumen 002 changed ownership on 1 November 2023 as part of Lumen Technologies' closed sale of its EMEA business to Colt Technology Services.
Marseille Lumen 002 announced
The divestiture covering Marseille Lumen 002 was announced on 2 November 2022, under which Lumen agreed to sell its EMEA business, including its terrestrial and subsea networks, data centers and network equipment, to London-headquartered Colt.
Marseille Zenlayer 003 commissioned
Zenlayer's presence at this facility was registered on PeeringDB on 11 June 2021 — a presence-registration date, not a commissioning date.
Marseille Zenlayer 001 commissioned
Zenlayer's presence at this facility was registered on PeeringDB on 11 June 2021 — a presence-registration date, not a commissioning date.
Marseille Digital Realty 008 expansion
Marseille Digital Realty 008 was expanded on 1 July 2020 with the opening of MRS3, described as its newest data centre in Marseille.
Marseille Digital Realty 008 ownership change
Marseille Digital Realty 008 changed ownership on 13 March 2020 as part of Digital Realty's completed combination with InterXion.
Marseille Digital Realty 011 ownership change
Marseille Digital Realty 011 changed ownership on 12 March 2020, as part of the completion of the Interxion Combination for total equity consideration of approximately $7.0 billion, including cash assumed.
Marseille Digital Realty 010 ownership change
Marseille Digital Realty 010 changed ownership on 12 March 2020, when Digital Realty completed the Interxion Combination for total equity consideration of approximately $7.0 billion, including cash assumed.
Questions about Marseille
- How many data centres are in Marseille?
- Marseille, France holds 10 data centres, 5 operators, 103 MW live (10% modelled). Digital Realty alone accounts for 6 sites, ahead of Telehouse.
- How much data centre capacity does Marseille have?
- DC Atlas tracks 10 data centres in the Marseille data centre market. 103 MW is live, for 103 MW of total potential at full buildout.
- Who are the largest data centre operators in Marseille?
- 5 operators run facilities in the Marseille data centre market. Digital Realty is the largest by total potential, with 6 sites and 76 MW.
- Which utilities supply power to data centres in Marseille?
- Enedis and EDF serve the most data centre sites in the Marseille data centre market. DC Atlas holds a named power supplier for 100% of the facilities it tracks here.
Every data centre we track in Marseille
10 facilities