Munich: 26 data centres, 17 operators, 127 MW live
There are 26 data centres in Munich, Germany, spanning 9 sub-markets, 17 operators, 24 operational, 127 MW live (18% modelled), 139 MW total potential. Largest by total potential: myLoc (3 sites), then Equinix.
Map of 22 data centres in Munich
Every Munich site DC Atlas tracks with a position on record, coloured by status.
Munich is one scope of the whole corpus. See every facility DC Atlas tracks on the global data center map.
Live
127MW
18% modelled
Under construction
7MW
Planned
0MW
Total potential
139MW
Who supplies the power
88% of the data centres we track in the Munich market have a named power supplier
- SWM Infrastruktur22sites
- Mainova1site
Who is building in Munich
The 10 largest operators here by total potential, of 17 tracked in this market.
| Operator | Sites | Live | Total potential |
|---|---|---|---|
| myLoc | 3 | 30 MW | 30 MW |
| Equinix | 3 | 18 MW | 18 MW |
| Kyndryl | 1 | 17 MW | 17 MW |
| NTT Global Data Centers | 2 | 15 MW | 15 MW |
| M-net | 2 | 10 MW | 10 MW |
| Portus Data Centers | 1 | — | 7 MW |
| Vodafone | 1 | 5 MW | 5 MW |
| noris network | 1 | 5 MW | 5 MW |
| T-Systems | 1 | — | 5 MW |
| Talia | 1 | 5 MW | 5 MW |
When Munich was built
39 MW of the live capacity here carries a commissioning date — 63% of the operational sites in this market.
Recent activity
7 recorded developments in the Munich market, the latest on 23 Jul 2026.
M-net to build new data center in Munich, Germany
M-net announced plans to construct a new data center facility in Munich, Germany. The project represents an expansion of the company's data center infrastructure in the region. The facility will serve the growing demand for data center capacity in southern Germany. Specific details regarding capacity, investment size, and timeline were not provided in the available text.
Equinix tops out Munich data center in Germany
Equinix has reached the topping-out milestone for its new data center facility in Munich, Germany. This construction milestone marks a significant progress point in the development of the facility. The project represents Equinix's expansion of its data center footprint in the German market.
Munich Equinix 010 decommissioned
Munich Equinix 010 was closed on 11 March 2025; the source states that the Equinix data centres "MU1" and "MU3" on Seidlstraße 3 were closed.
Aschheim Equinix 009 commissioned
Aschheim Equinix 009 came into service on 7 February 2022, when Equinix opened its new IBX data center, MU4, located in Aschheim near Munich, Germany.
Aschheim Equinix 009 ownership change
Aschheim Equinix 009 changed ownership as part of a transaction in 2020, per a table entry referencing the Munich metro facility.
Munich Equinix 010 commissioned
Munich Equinix 010 came into service in 2010, according to a table entry listing MU3 Munich (metro), Germany.
Munich Equinix 010 ownership change
Munich Equinix 010 changed ownership on 14 September 2007 when Equinix, Inc. completed its acquisition of IXEurope.
Questions about Munich
- How many data centres are in Munich?
- There are 26 data centres in Munich, Germany, spanning 9 sub-markets, 17 operators, 24 operational, 127 MW live (18% modelled), 139 MW total potential. Largest by total potential: myLoc (3 sites), then Equinix.
- How much data centre capacity does Munich have?
- DC Atlas tracks 26 data centres in the Munich data centre market. 127 MW is live, 7 MW is under construction, for 139 MW of total potential at full buildout.
- Who are the largest data centre operators in Munich?
- 17 operators run facilities in the Munich data centre market. myLoc is the largest by total potential, with 3 sites and 30 MW.
- Which utilities supply power to data centres in Munich?
- SWM Infrastruktur and Mainova serve the most data centre sites in the Munich data centre market. DC Atlas holds a named power supplier for 88% of the facilities it tracks here.