Back to Facilities
AnnouncedHyperscale

Casper Prometheus Hyperscale 001 — 1,250 MW announced

Prometheus Hyperscale

Casper, United States

Casper Prometheus Hyperscale 001 is a hyperscale data centre operated by Prometheus Hyperscale in Casper, United States, in the Wyoming market. The site has been announced and is not yet operational, with 1,250 MW of announced capacity.

Who operates Casper Prometheus Hyperscale 001?
Prometheus Hyperscale.
Where is Casper Prometheus Hyperscale 001?
Casper, United States, in the Wyoming market.
Is Casper Prometheus Hyperscale 001 operational?
Not yet, Casper Prometheus Hyperscale 001 has been announced and is not recorded as operational.
What is the capacity of Casper Prometheus Hyperscale 001?
1,250 MW announced.

Project tracker

1,250 MW announced

Announced figure, unverified: no source on record has been checked against a second.

1,250 MW announced in the Cheyenne market, which has 57 MW live today, 238 MW under construction and 305 MW of total potential at full buildout.

The market today · Cheyenne

Live
57 MW70% modelled
Under construction
238 MW
Total potential
305 MW63% of pipeline modelled

Timeline

  1. Announcement

    Casper Prometheus Hyperscale 001 — announced

    Casper, WY – October 7, 2025 /PRNewswire— Prometheus Hyperscale, Spiritus, and Casper Carbon Capture today announced a strategic partnership to develop a pioneering carbon-negative digital infrastructure campus in Wyoming.

    Source: prometheushyperscale.com

  2. Permit filed

    Prometheus Hyperscale pitches 940-acre data center, requests Natrona County bypass state review

    Prometheus Hyperscale founder Trenton Thornock and Build Wyoming Director Eric Schlidt presented a proposal to Natrona County commissioners on September 2, 2026, requesting an industrial park zoning designation for a planned 1.5-gigawatt, $500 million data center campus on 940 acres of Falls Ranch property south of Interstate 25 near Casper. The designation would exempt the project from Wyoming Industrial Siting Council review while maintaining county-level oversight and state environmental regulation. Commissioners took no immediate action; the workshop included extensive public comment from both supporters and opponents of the development, with concerns raised about landscape impact, noise, water use, and air quality, while supporters emphasized local control and job creation.

    Source: wyofile.com

Also announced or under construction by Prometheus Hyperscale

Coordinates

Position

42.85, -106.3

Location precision

Approximate

Beyond the location

DC Atlas tracks the grid connection behind data centres across 65 countries — who supplies the power, the market it sits in, and what is being built next.

Sign up free