Market
Cheyenne: 9 sites, 8 operators, 238 MW under construction
Cheyenne, United States has 9 data centres, 6 operational, spanning 2 sub-markets, 8 operators, 57 MW live (70% modelled), 238 MW under construction. Largest by total potential: Meta (1 site), then CoreWeave.
Map of 8 data centres in Cheyenne
Every Cheyenne site DC Atlas tracks with a position on record, coloured by status.
Cheyenne is one scope of the whole corpus. See every facility DC Atlas tracks on the global data center map.
Live
57MW
70% modelled
Under construction
238MW
Planned
0MW
Total potential
305MW
63% of pipeline modelled
Who supplies the power
44% of the data centres we track in the Cheyenne market have a named power supplier
- Black Hills Energy3sites
- Cheyenne Light1site
Who is building in Cheyenne
The 8 largest operators here by total potential, of 8 tracked in this market.
| Operator | Sites | Live | Total potential |
|---|---|---|---|
| Meta | 1 | — | 150 MW |
| CoreWeave | 1 | — | 88 MW |
| Microsoft | 1 | 40 MW | 40 MW |
| Mountain West Technology Networks | 1 | — | 10 MW |
| 1547 Critical Systems Realty | 2 | 10 MW | 10 MW |
| Lunavi | 1 | 5 MW | 5 MW |
| Cogent | 1 | 2.5 MW | 2.5 MW |
| Crusoe | 1 | — | — |
Only 67% of the live facilities here carry a commissioning date across too few years, which is too thin to chart as a build history.
Recent activity
15 recorded developments in the Cheyenne market, the latest on 2 Sept 2026.
Prometheus Hyperscale pitches 940-acre data center, requests Natrona County bypass state review
Prometheus Hyperscale founder Trenton Thornock and Build Wyoming Director Eric Schlidt presented a proposal to Natrona County commissioners on September 2, 2026, requesting an industrial park zoning designation for a planned 1.5-gigawatt, $500 million data center campus on 940 acres of Falls Ranch property south of Interstate 25 near Casper. The designation would exempt the project from Wyoming Industrial Siting Council review while maintaining county-level oversight and state environmental regulation. Commissioners took no immediate action; the workshop included extensive public comment from both supporters and opponents of the development, with concerns raised about landscape impact, noise, water use, and air quality, while supporters emphasized local control and job creation.
Black Hills Corp reports Q2 2026 results; progresses on 1.8 GW Wyoming data-centre project
Black Hills Corp., a Wyoming-based electric utility, reported second-quarter 2026 earnings and reaffirmed 2026 adjusted EPS guidance of $4.25–$4.45 per share. Wyoming Electric recorded four new all-time customer load peaks year-to-date, driven primarily by large-load data-centre demand, with the most recent peak of 439 MW on 20 July 2026 (16% above prior year). The company is progressing toward definitive agreements to serve a 1.8 GW data-centre project in Cheyenne, Wyoming, and has a pipeline of more than 3 GW in large-load demand including Microsoft and Meta expansions (600 MW in service by 2030). A prospective customer for the 1.8 GW project provided $377 million in refundable advances through August 2026 to secure generation equipment.
Wyoming considers power supply regulations for AI data centers
Wyoming is contemplating new regulatory frameworks to govern power supply for artificial intelligence and data center operations in the state. The proposed regulations would address the growing power demands from AI and data center facilities. This reflects state-level concern about resource allocation and infrastructure planning as AI workloads expand. The regulations could impact how data center operators secure and manage electricity supply in Wyoming.
Data center expansion in Wyoming faces water pollution concerns
Water pollution issues have emerged as data centers proliferate across Wyoming, raising environmental concerns and community opposition. The influx of data-center development is causing water quality degradation in the state. Local stakeholders are questioning whether industry good-faith commitments to environmental stewardship are being upheld. This incident reflects growing tensions between rapid data-center infrastructure expansion and environmental protection in the region.
Blockmate Ventures raises C$1M for Wyoming AI data center
Blockmate Ventures secured C$1 million in funding for an artificial intelligence data center project in Wyoming. The financing round supports the company's expansion into AI infrastructure. Wyoming is emerging as a favorable jurisdiction for data center development. The capital will fund facility development in the region.
Cheyenne suspends data center wastewater discharge after Meta-linked contamination
The city of Cheyenne has halted industrial wastewater discharges from data centers indefinitely. This decision follows a contamination incident linked to a Meta subcontractor, which disrupted the city's water reuse system for several months.
Cheyenne pauses data center wastewater discharges after contamination incident
The Cheyenne Board of Public Utilities revoked sewer privileges from Goat Systems, an 800,000-square-foot data center campus operator, following contamination of the city's wastewater reclamation network. The city announced June 26 that it would temporarily pause data center discharges and officially turn on the wastewater reuse system at the end of the month. The incident highlights environmental compliance risks for large data center operators in water-constrained regions.
Black Hills Secures Equipment Agreement for 1.8 GW Wyoming Data Center Project
Wyoming Electric, a Black Hills Corp. subsidiary, executed an agreement with a prospective customer on April 22, 2026, to procure long lead-time generation equipment for a 1.8 GW data center project. The customer has provided $201 million in refundable contributions in aid of construction to secure equipment milestone payments. The project will be served under Wyoming Electric's Large Power Contract Service Tariff, with negotiations continuing on definitive agreements.
Who is hiring in Cheyenne
5 open data centre roles at 2 operators we track
Two operators are recruiting in Cheyenne, 5 roles between them: T5 Data Centers with 3 and CoreWeave with 2. None of them are build-side: this is a market staffing what is already standing, critical facilities accounting for 5 of the 5. More than half of them, 4 of the 5, were posted in the last 30 days.
- T5 Data Centers3roles
- CoreWeave2roles
The mix
- critical facilities5
The roles behind those numbers
Most recently opened
- CoreWeavecritical facilities11 Sept 2026
- CoreWeavecritical facilities10 Sept 2026
- T5 Data Centerscritical facilities2 Sept 2026
- T5 Data Centerscritical facilities24 Aug 2026
- T5 Data Centerscritical facilities26 Jun 2026
Counted from the operators' own public careers feeds, read daily. A role counts here when the employer runs a data centre we track and the work is operational rather than back office. What these roles involve, and what they pay.
Questions about Cheyenne
- How many data centres are in Cheyenne?
- Cheyenne, United States has 9 data centres, 6 operational, spanning 2 sub-markets, 8 operators, 57 MW live (70% modelled), 238 MW under construction. Largest by total potential: Meta (1 site), then CoreWeave.
- How much data centre capacity does Cheyenne have?
- DC Atlas tracks 9 data centres in the Cheyenne data centre market. 57 MW is live, 238 MW is under construction, for 305 MW of total potential at full buildout.
- Who are the largest data centre operators in Cheyenne?
- 8 operators run facilities in the Cheyenne data centre market. Meta is the largest by total potential, with 1 site and 150 MW.
- Which utilities supply power to data centres in Cheyenne?
- Black Hills Energy and Cheyenne Light serve the most data centre sites in the Cheyenne data centre market. DC Atlas holds a named power supplier for 44% of the facilities it tracks here.
Every data centre we track in Cheyenne
9 facilities
1547 Critical Systems1
Cogent1
CoreWeave1
Crusoe1
Fifteenfortyseven critical systems realty1
Lunavi1
Meta1
Microsoft1
Mountain West Technology Networks1
Other markets in United States
- Northern Virginia314
- Southern Ohio (Piketon)1
- West Texas12
- Columbus65
- Atlanta91
- Dallas/Fort Worth129
- Chicago123
- North Louisiana (Richland Parish)2
- Phoenix70
- Charlotte33
- El Paso / Santa Teresa7
- Savannah1
- Richmond20
- South Bend / New Carlisle9
- Columbia Basin (Oregon)48
- Texas Panhandle3
- Milwaukee15
- Northern California120
- Amarillo3
- Des Moines15
- Susquehanna Valley (Berwick)2
- Augusta / Aiken3
- Salt Lake City31
- Detroit26