Back to Facilities

Market

West Texas: 12 sites, 9 operators, 5,705 MW under construction

Of the 12 data centres DC Atlas tracks in West Texas, United States, 2 are operational, run by 9 operators, 305 MW live (2% modelled), 5,705 MW under construction. Largest by total potential: IREN (2 sites), then Vantage Data Centers.

Map of 7 data centres in West Texas

Every West Texas site DC Atlas tracks with a position on record, coloured by status.

Open West Texas in the ExplorerFilter, compare and search every facility on the live map. Free account, no card.

West Texas is one scope of the whole corpus. See every facility DC Atlas tracks on the global data center map.

Embed the West Texas data center map

Paste this into any page. The map stays live as the data changes, every pin still opens its facility page, and the frame carries a link back to DC Atlas. Free to use, no key needed.

Customise this embedPick a country, market or operator, narrow it by status and type, set the size, and watch the map update as you choose.Open the embed builder

Live

305MW

2% modelled

Under construction

5,705MW

Planned

660MW

Total potential

7,570MW

0% of pipeline modelled

Who supplies the power

58% of the data centres we track in the West Texas market have a named power supplier

  • Oncor5sites
  • AEP Texas1site
  • on-site natural gas and grid power1site

Who is building in West Texas

The 9 largest operators here by total potential, of 9 tracked in this market.

OperatorSitesLiveTotal potential
IREN22,000 MW
Vantage Data Centers21,400 MW
SB Energy11,200 MW
Crusoe1900 MW
Google1640 MW
CoreWeave1200 MW
Crane Data Centers120 MW
Lumen15 MW5 MW
Satokie Mining15 MW

DC Atlas holds no commissioning date for any of the 2 live facilities here, so there is no build history to chart.

Recent activity

17 recorded developments in the West Texas market, the latest on 5 Aug 2026.

  • 5 Aug 2026Earnings$3.5B

    Galaxy Digital Reports Q2 2026 Results; Expands Data Centre Pipeline to 5.7 GW

    Galaxy Digital Inc. reported Q2 2026 financial results with a net loss of $85 million, while announcing substantial expansion of its data centre footprint through three new Texas site acquisitions (Merlin, Caspian, Selene) with a combined potential capacity of approximately 1.6 GW. The company completed delivery of 200 MW (133 MW critical IT load) at its Helios campus in West Texas to CoreWeave and closed a $3.5 billion senior secured notes offering to fund Phase II construction. Total power pipeline reached over 5.7 GW, with cash and stablecoin holdings of $2.5 billion as of quarter-end.

  • 30 Jul 2026Announced400 MW

    PowerPlay AI and Sharon AI plan 400 MW gas-powered data center in Abilene, Texas

    PowerPlay AI and Sharon AI have announced plans for a 400 MW behind-the-meter gas-powered data center in Abilene, Texas.

  • 23 Jul 2026Announced

    Duos Edge AI Opens Abilene Communications Hub

    Duos Edge AI is celebrating the grand opening of its new communications hub in Abilene, Texas. The company will host a community open house on July 23rd, featuring a ribbon-cutting ceremony and facility tours. This expansion marks a significant milestone in Duos Edge AI's strategy to build AI-ready infrastructure in underserved markets.

  • 23 Jul 2026Partnership

    Liberty Energy and PowerBridge form data centre joint venture

    Liberty Energy, a Denver-based oilfield services company, and PowerBridge have announced a joint venture to develop power-integrated data centre campuses for hyperscale and AI workloads. The partnership will begin with a planned 2GW facility in West Texas, USA, combining PowerBridge's digital campus expertise with Liberty Energy's power infrastructure capabilities. The venture addresses the growing demand for data centre capacity with integrated power generation.

  • 20 Jul 2026Investment750 MW

    Empery Digital invests $20M in Cardinal Data Power West Texas campus

    Empery Digital Inc. announced a $20 million strategic investment in Cardinal Data Power Inc. (CDP), acquiring approximately 8% ownership via Series A preferred stock. The investment closed on July 20, 2026, as part of a $70 million Series A financing round. CDP plans to develop a 750 MW Phase I behind-the-meter powered data center campus in West Texas in partnership with Hunt Properties.

  • 20 Jul 2026Partnership400 MW

    PowerPlay AI and Neocloud Partner on 400 MW AI Data Center in Abilene

    PowerPlay AI announced a joint venture with Nasdaq-listed Neocloud to develop a 400 MW behind-the-meter AI data center in the Greater Abilene region. The partnership combines PowerPlay AI's development capabilities with Neocloud's public market resources and infrastructure experience. This behind-the-meter facility is designed to support AI workloads with on-site power generation or procurement.

  • 9 Jul 2026Partnership200 MW

    CleanCore Solutions Closes First Data Center Project in West Texas

    CleanCore Solutions (ZONE) closed its first data center project, a partnership with HST Technologies in West Texas with initial 200-megawatt capacity expandable to 500+ megawatts by 2030. The company will own over 95% of the project and fund $100 million by Q1 2027, with full commitment through 2029. Tyler Hassen was appointed CEO to lead the company's strategic shift from cleaning services to AI infrastructure development. The project demonstrates CleanCore's execution pace in building critical data center infrastructure to meet accelerating AI compute demand.

  • 30 Jun 2026Commissioned133 MW

    Galaxy Digital completes Helios Phase I delivery of 133 MW critical IT load to CoreWeave

    Galaxy Digital Inc. completed delivery of the first phase of power at its Helios data center campus in West Texas, delivering 200 MW of gross power and 133 MW of critical IT load to CoreWeave under a 15-year lease agreement. Phase I was delivered on schedule in Q2 2026, with rent commencement scaling throughout the quarter. Galaxy expects Phase I to generate approximately $80 million in quarterly leasing revenue with projected Adjusted EBITDA margins exceeding 90% beginning Q3 2026. The company also secured $3.5 billion in senior secured notes on July 28 to fund Phase II construction, a 260 MW expansion with data hall deliveries expected to begin in Q2 2027.

All recent activity

Who is hiring in West Texas

3 open data centre roles at 1 operator we track

Crusoe is the only operator recruiting in West Texas, with 3 roles open across 2 disciplines. None of them are build-side: this is a market staffing what is already standing, energy and utilities accounting for 2 of the 3. 1 of the 3 was posted in the last 30 days.

The mix

  • energy and utilities2
  • health and safety1

The roles behind those numbers

Most recently opened

  • Crusoehealth and safety15 Sept 2026
  • Crusoeenergy and utilities6 Aug 2026
  • Crusoeenergy and utilities23 Mar 2026

Counted from the operators' own public careers feeds, read daily. A role counts here when the employer runs a data centre we track and the work is operational rather than back office. What these roles involve, and what they pay.

Questions about West Texas

How many data centres are in West Texas?
Of the 12 data centres DC Atlas tracks in West Texas, United States, 2 are operational, run by 9 operators, 305 MW live (2% modelled), 5,705 MW under construction. Largest by total potential: IREN (2 sites), then Vantage Data Centers.
How much data centre capacity does West Texas have?
DC Atlas tracks 12 data centres in the West Texas data centre market. 305 MW is live, 5,705 MW is under construction, 660 MW is planned, for 7,570 MW of total potential at full buildout.
Who are the largest data centre operators in West Texas?
9 operators run facilities in the West Texas data centre market. IREN is the largest by total potential, with 2 sites and 2,000 MW.
Which utilities supply power to data centres in West Texas?
Oncor, AEP Texas and on-site natural gas and grid power serve the most data centre sites in the West Texas data centre market. DC Atlas holds a named power supplier for 58% of the facilities it tracks here.

Every data centre we track in West Texas

10 of 12 with a published page