Portugal: 14 sites, 7 operators, 550 MW under construction

Of the 14 data centres DC Atlas tracks in Portugal across 5 markets, 5 are operational, run by 7 operators, 58 MW live (9% modelled), 550 MW under construction. Start Campus alone accounts for 6 sites, ahead of Edged Energy.

Map of 9 data centres in Portugal

Every Portugal site DC Atlas tracks with a position on record, coloured by status.

Open Portugal in the ExplorerFilter, compare and search every facility on the live map. Free account, no card.

Portugal is one scope of the whole corpus. See every facility DC Atlas tracks on the global data center map.

Embed the Portugal data center map

Paste this into any page. The map stays live as the data changes, every pin still opens its facility page, and the frame carries a link back to DC Atlas. Free to use, no key needed.

Customise this embedPick a country, market or operator, narrow it by status and type, set the size, and watch the map update as you choose.Open the embed builder

Live

58MW

9% modelled

Under construction

550MW

Planned

909MW

Total potential

1,517MW

28% of pipeline modelled

Who supplies the power

100% of the data centres we track in Portugal have a named power supplier

  • E-REDES10sites
  • REN3sites
  • E-REDES & REN1site

Who is building in Portugal

The 7 largest operators here by total potential, of 7 tracked in this country.

OperatorSitesLiveTotal potential
Start Campus626 MW1,091 MW
Edged Energy2360 MW
AtlasEdge25.1 MW29 MW
Equinix121 MW21 MW
Google110 MW
Claranet15 MW5 MW
Grupo Aire11.5 MW1.5 MW

Only 60% of the live facilities here carry a commissioning date across too few years, which is too thin to chart as a build history.

Recent activity

5 recorded developments in Portugal, the latest on 31 Oct 2028.

  • 31 Oct 2028Investment$21.8M

    University of Lisbon invests €20M in two sovereign cloud datacenters

    Universidade de Lisboa is investing over €20 million to build two new datacenters across its Oeiras and Cidade Universitária campuses as part of a sovereign cloud infrastructure project for scientific research. The project is developed collaboratively by IST, Faculty of Sciences, GIMM, and the university's rectory. Construction is expected to complete by October 2028. This initiative aims to create independent cloud computing capacity for the Portuguese scientific community.

  • 3 Aug 2026Announced

    Start Campus announces SIN02, 180-200MW AI data centre at Portugal Sines campus

    Start Campus announced SIN02, its second hyperscale facility at the 1.2GW Sines Data Campus in Portugal, designed for AI and HPC workloads with 180-200MW capacity and ultra-high density up to 700kW per rack. Construction has commenced with completion expected by end of 2027, and the facility will operate on 100% renewable energy with seawater cooling for zero freshwater use. Nscale will be the full tenant, delivering the data centre to Microsoft, and the facility is planned to host 66,000 Nvidia Vera Rubin chips. Start Campus also signed an MoU with EDP to develop additional renewable capacity in Portugal to power the campus without impacting local energy supply.

  • 13 Jul 2026Market milestone

    Portugal's Data Center Market Poised for Growth, Valued at US$3.89 Billion by 2026-2031

    Portugal's data center market is projected to reach US$3.89 billion between 2026 and 2031. Key players are investing in renewable energy and AI infrastructure, with Lisbon emerging as a preferred location.

  • 4 Jun 2024Announced

    Lisbon Equinix 001 announced

    Lisbon Equinix 001 was announced on 4 June 2024; the source states it will be located adjacent to Equinix's existing LS1 site, forming a campus.

  • 10 Oct 2017Acquisition

    Lisbon Equinix 001 ownership change

    Lisbon Equinix 001 changed ownership as part of a transaction on 10 October 2017, when the purchase of Itconic was announced as closed.

All recent activity

Who is hiring in Portugal

7 open data centre roles at 2 operators we track

Two operators are recruiting in Portugal, 7 roles between them: Start Campus with 6 and Nscale with 1. 5 of the 7 are build-side, led by design and engineering at 4. That is the staffing profile of a market putting capacity up rather than running it. 1 of the 7 was posted in the last 30 days.

The mix

  • design and engineering4
  • critical facilities1
  • energy and utilities1
  • project management1

Most recently opened

  • Start Campusenergy and utilities21 Sept 2026
  • Start Campuscritical facilities20 Jul 2026
  • Start Campusdesign and engineering14 Jul 2026
  • Start Campusdesign and engineering3 Jun 2026
  • Nscaleproject management29 Apr 2026

Counted from the operators' own public careers feeds, read daily. A role counts here when the employer runs a data centre we track and the work is operational rather than back office. What these roles involve, and what they pay.

Questions about Portugal

How many data centres are there in Portugal?
Of the 14 data centres DC Atlas tracks in Portugal across 5 markets, 5 are operational, run by 7 operators, 58 MW live (9% modelled), 550 MW under construction. Start Campus alone accounts for 6 sites, ahead of Edged Energy.
How much data centre capacity does Portugal have?
DC Atlas tracks 14 data centres in Portugal. 58 MW is live, 550 MW is under construction, 909 MW is planned, for 1,517 MW of total potential at full buildout.
Who are the largest data centre operators in Portugal?
7 operators run facilities in Portugal. Start Campus is the largest by total potential, with 6 sites and 1,091 MW.
Which utilities supply power to data centres in Portugal?
E-REDES, REN and E-REDES & REN serve the most data centre sites in Portugal. DC Atlas holds a named power supplier for 100% of the facilities it tracks here.

Every data centre we track in Portugal

14 facilities

Markets in Portugal