Groningen / Eemshaven: 4 data centres, 2 operators, 134 MW live
Groningen / Eemshaven, Netherlands holds 4 data centres, 2 operators, 134 MW live (98% modelled). Google alone accounts for 2 sites, ahead of Eurofiber.
Map of 3 data centres in Groningen / Eemshaven
Every Groningen / Eemshaven site DC Atlas tracks with a position on record, coloured by status.
Groningen / Eemshaven is one scope of the whole corpus. See every facility DC Atlas tracks on the global data center map.
Live
134MW
98% modelled
Under construction
0MW
Planned
0MW
Total potential
134MW
Who supplies the power
100% of the data centres we track in the Groningen / Eemshaven market have a named power supplier
- Enexis4sites
Only 75% of the live facilities here carry a commissioning date across too few years, which is too thin to chart as a build history.
Recent activity
23 recorded developments in the Groningen / Eemshaven market, the latest on 29 Oct 2025.
Gemeente Oldambt Files Design Modification for Data Center Cable Route in Winschoten
The municipality of Oldambt published an official notice (gmb-2025-465315) on October 29, 2025, regarding a design modification to its spatial plan (omgevingsplan) for a data center cable corridor in Winschoten, Netherlands. The modification involves a TAM-omgevingsplan (territorial accessibility modification) to accommodate underground cable infrastructure serving a planned data center facility. This represents a regulatory step in the permitting process for the data center project's connection infrastructure.
Groundwater extraction permit filed for datacenter expansion at Eemshaven
An official Dutch permit application (wsb-2025-4964) was published for groundwater extraction required to support Phase GRQ6A expansion of a datacenter facility near Oostpolder 4 in Eemshaven. The filing indicates an active datacenter development project in the Netherlands seeking environmental authorization for water resources. This permit is a regulatory milestone in the facility's infrastructure development.
Gemeente Oldambt Files Permit Amendment for Kabeltracé Data Center in Winschoten
The municipality of Oldambt (Netherlands) published an official notice (gmb-2024-405899) on 25 September 2024 regarding a proposed amendment to the local spatial plan (omgevingsplan) for the Kabeltracé data center project in Winschoten. The filing indicates progress toward regulatory approval for the infrastructure project. This represents a formal procedural step in the Dutch planning process required before construction can proceed.
Green Box Computing Winschoten DC1A permit approved
Dutch official publication (prb-2023-12116) confirms final permit approval for Green Box Computing B.V.'s Hoogebrug III data-center facility (DC1A) in Winschoten, Netherlands. This regulatory decision clears the way for the facility development. The approval represents a key milestone in the project's progression toward construction.
Groningen Datacenter Westpoort Excavation Permit Approved 2022-26
Dutch official publication (prb-2023-6072) approved an excavation permit (ontgrondingenvergunning) for the Datacenter Westpoort facility in Groningen for the period 2022–2026. The permit decision was formally published on 31 May 2023. This regulatory approval enables ground extraction and site preparation activities necessary for the data center's development in the Westpoort industrial area.
QTS Data Center Eemshaven Facility Granted Environmental Permit
QTS received formal environmental approval (extended procedure, reference prb-2023-541) for a data-center facility at Kwelderweg in Eemshaven, Netherlands. The permit was issued by Dutch authorities following an extended environmental review process. This approval enables QTS to proceed with development of the facility in the strategic Eemshaven industrial zone. The decision represents a milestone in QTS's European infrastructure expansion.
Permit application filed for data center development in Groningen, Netherlands
A permit application was filed on 13 December 2022 for the redevelopment of an area in Westpoort, Groningen, to construct a data center facility. The application was published in the official Dutch municipal gazette (gmb-2022-550379). This marks a formal regulatory step in the project development process for the proposed facility.
QTS Files Extended Environmental Permit Application for Eemshaven Data Center
QTS Kwelderweg submitted a design decision for an extended environmental permit procedure at its Eemshaven facility in the Netherlands on November 23, 2022. The application was published in the official Dutch government registry (prb-2022-13832). This permit process is part of QTS's development planning for the data center location. The extended procedure suggests a more complex environmental review given the facility's scale or site characteristics.
Questions about Groningen / Eemshaven
- How many data centres are in Groningen / Eemshaven?
- Groningen / Eemshaven, Netherlands holds 4 data centres, 2 operators, 134 MW live (98% modelled). Google alone accounts for 2 sites, ahead of Eurofiber.
- How much data centre capacity does Groningen / Eemshaven have?
- DC Atlas tracks 4 data centres in the Groningen / Eemshaven data centre market. 134 MW is live, for 134 MW of total potential at full buildout.
- Who are the largest data centre operators in Groningen / Eemshaven?
- 2 operators run facilities in the Groningen / Eemshaven data centre market. Google is the largest by total potential, with 2 sites and 124 MW.
- Which utilities supply power to data centres in Groningen / Eemshaven?
- Enexis serve the most data centre sites in the Groningen / Eemshaven data centre market. DC Atlas holds a named power supplier for 100% of the facilities it tracks here.