Amsterdam: 58 data centres, 22 operators, 548 MW live
There are 58 data centres in Amsterdam, Netherlands, spanning 6 sub-markets, 22 operators, 50 operational, 548 MW live (38% modelled), 982 MW total potential. Largest by total potential: Equinix (9 sites), then Switch.
Map of 50 data centres in Amsterdam
Every Amsterdam site DC Atlas tracks with a position on record, coloured by status.
Amsterdam is one scope of the whole corpus. See every facility DC Atlas tracks on the global data center map.
Live
548MW
38% modelled
Under construction
172MW
Planned
235MW
Total potential
982MW
30% of pipeline modelled
Who supplies the power
100% of the data centres we track in the Amsterdam market have a named power supplier
- Liander41sites
- Stedin14sites
- Enexis3sites
Who is building in Amsterdam
The 10 largest operators here by total potential, of 22 tracked in this market.
| Operator | Sites | Live | Total potential |
|---|---|---|---|
| Equinix | 9 | 87 MW | 188 MW |
| Switch | 2 | — | 95 MW |
| Digital Realty | 5 | 56 MW | 83 MW |
| Global Switch | 2 | 42 MW | 74 MW |
| EdgeConnex | 1 | 63 MW | 63 MW |
| CyrusOne | 1 | 54 MW | 54 MW |
| NTT Global Data Centers | 1 | 40 MW | 40 MW |
| Keppel Data Centres | 2 | 29 MW | 29 MW |
| SmartDC | 2 | 19 MW | 19 MW |
| KPN Wholesale | 1 | 14 MW | 14 MW |
When Amsterdam was built
73 MW of the live capacity here carries a commissioning date — 22% of the operational sites in this market.
Recent activity
198 recorded developments in the Amsterdam market, the latest on 18 Aug 2026.
Greenhouse Datacenters files permit to renovate Amsterdam data centre
Greenhouse Datacenters B.V. filed a permit application on 18 August 2026 to renovate an existing data centre at Zekeringstraat 47 in Amsterdam. The application (case number OD2026-0053129) was received by the Omgevingsdienst Noordzeekanaalgebied on behalf of Amsterdam municipality. The public notice was published on 28 August 2026 in the official gazette.
Environmental Permit Filed for Schelde 1, The Hague
An environmental permit (omgevingsvergunning) application was filed on July 15, 2026, for a property at Schelde 1 in 's-Gravenhage (The Hague), Netherlands, under official publication gmb-2026-337653. The filing represents a formal regulatory step in the Dutch permitting process for a facility or development project. This Dutch government record indicates a project advancement requiring environmental and planning approval.
Permit application received for data center legalization at Schiphol
A permit application (gmb-2026-334666) was filed with Dutch authorities on July 13, 2026, for the legalization of a data center facility at Cateringweg 5 in Schiphol. The application seeks official approval to legitimize an existing data center operation at this location. This represents a formal regulatory step in the permitting process for the facility. The Schiphol area near Amsterdam is a strategic location for data center infrastructure in the Netherlands.
Equinix obtient le permis de construire pour un méga data center à Amsterdam
Datacenter Phase 2 Permit Approved in Schiphol-Rijk, Netherlands
Dutch authorities granted a building permit for phase 2 of a datacenter facility at Koolhovenlaan 142 in Schiphol-Rijk, as documented in official publication prb-2026-11662. The permit approval represents progress on the expansion of the datacenter infrastructure in this logistics hub near Amsterdam. This phase 2 development indicates the original facility is proceeding with planned capacity growth.
Datacenter modification permit approved in Woerden, Netherlands
The municipality of Woerden approved a permit for modifying a datacenter facility located at Polanerbaan 1, 3447 GN Woerden. The permit application was received on 14 July 2025 and the decision was issued on 6 July 2026. This represents a regulatory approval for datacenter infrastructure changes in the Netherlands.
Equinix Files Design Permit for AM9/AM10 Data Centers in Amsterdam
Equinix Netherlands B.V. filed a design permit (prb-2026-11319) with Dutch authorities for construction of data centers AM9 and AM10 at Luttenbergweg 1 and 3A–3D in Amsterdam. The permit documentation was made available for public review on July 6, 2026. This filing represents a formal step in the regulatory approval process for the facility expansion in the Amsterdam market.
Aalsmeer Municipality Files Data Center Permit Application
The municipality of Aalsmeer in the Netherlands filed a design permit (omgevingsvergunning) application for data center development on the Oosteind parcel. The permit application deviates from the existing zoning plan but falls under the umbrella zoning designation for data centers in Aalsmeer ('Paraplubestemmingsplan Datacenter Aalsmeer'). This represents an official step in the permitting process for data center facility development in the region.
Who is hiring in Amsterdam
22 open data centre roles at 2 operators we track
Two operators are recruiting in Amsterdam, 22 roles between them: Nebius with 21 and EdgeConnex with 1. 17 of the 22 are build-side, led by project management at 12. That is the staffing profile of a market putting capacity up rather than running it. 4 of the 22 were posted in the last 30 days.
- Nebius21roles
- EdgeConnex1role
The mix
- project management12
- design and engineering3
- network3
- security2
- construction1
- development and land1
The roles behind those numbers
Most recently opened
- Nebiusdesign and engineering3 Sept 2026
- Nebiusproject management28 Aug 2026
- Nebiusproject management28 Aug 2026
- Nebiussecurity27 Aug 2026
- Nebiusnetwork31 Jul 2026
Counted from the operators' own public careers feeds, read daily. A role counts here when the employer runs a data centre we track and the work is operational rather than back office. What these roles involve, and what they pay.
Questions about Amsterdam
- How many data centres are in Amsterdam?
- There are 58 data centres in Amsterdam, Netherlands, spanning 6 sub-markets, 22 operators, 50 operational, 548 MW live (38% modelled), 982 MW total potential. Largest by total potential: Equinix (9 sites), then Switch.
- How much data centre capacity does Amsterdam have?
- DC Atlas tracks 58 data centres in the Amsterdam data centre market. 548 MW is live, 172 MW is under construction, 235 MW is planned, for 982 MW of total potential at full buildout.
- Who are the largest data centre operators in Amsterdam?
- 22 operators run facilities in the Amsterdam data centre market. Equinix is the largest by total potential, with 9 sites and 188 MW.
- Which utilities supply power to data centres in Amsterdam?
- Liander, Stedin and Enexis serve the most data centre sites in the Amsterdam data centre market. DC Atlas holds a named power supplier for 100% of the facilities it tracks here.
Every data centre we track in Amsterdam
53 of 58 with a published page