Middenmeer (Agriport A7): 3 data centres, 2 operators, 310 MW live

There are 3 data centres in Middenmeer (Agriport A7), Netherlands, 2 operators, 2 operational, 310 MW live (100% modelled), 360 MW total potential. Microsoft alone accounts for 2 sites, ahead of Google.

Live

310MW

100% modelled

Under construction

0MW

Planned

50MW

Total potential

360MW

100% of pipeline modelled

Who supplies the power

100% of the data centres we track in the Middenmeer (Agriport A7) market have a named power supplier

  • Liander3sites

Only 50% of the live facilities here carry a commissioning date across too few years, which is too thin to chart as a build history.

Recent activity

25 recorded developments in the Middenmeer (Agriport A7) market, the latest on 29 Jul 2026.

  • 29 Jul 2026Land acquired

    Microsoft buys more land in Middenmeer, Netherlands, for potential data center development

    Microsoft has acquired additional land in Middenmeer, Netherlands, for potential data centre development.

  • 27 Jul 2026Permit filed

    Permit application filed for data centres at Flevoweg, Middenmeer

    Dutch official publication of a permit application (wsb-2026-19860) for groundwater extraction and surface-water discharge for data-centre construction at Flevoweg in Middenmeer, dated 2026-07-27.

  • 24 Jul 2026Permit filed

    Datacenter Permit Filed at Agriport A7, Middenmeer, Netherlands

    An official permit application (prb-2026-12713) was filed for a datacenter facility with supporting infrastructure on the Agriport A7 business park in Middenmeer, Netherlands. The project is planned for sites along Flevoweg and Tussenweg. This marks the formal regulatory stage in the facility's development process. The filing indicates industry interest in expanding datacenter capacity in this Dutch industrial zone.

  • 31 Dec 2025Market milestone

    Microsoft data center in Middenmeer to consume 1% of Netherlands' electricity

    A Microsoft data center facility in Middenmeer, Netherlands is projected to consume approximately one percent of all electricity used in the country by 2025. The facility represents a significant concentration of energy demand in a single data-center location within the Dutch grid. This milestone highlights the growing power intensity of hyperscale data-center infrastructure driven by AI and cloud computing workloads. The facility's energy footprint raises questions about grid capacity, renewable energy sourcing, and national energy policy implications.

  • 30 Jul 2024Permit approved

    Environmental permit approved for AMS 5-9, 11-12 data centers at Agriport Middenmeer

    Dutch official publication (prb-2024-11513) approved an environmental protection permit for the operation of Datacenter AMS facilities 5 through 9, 11, and 12 at Agriport 570 in Middenmeer, Netherlands. The permit decision enables these multiple data center units to commence operations at the location. This represents a regulatory milestone for the AMS data center cluster development in the Netherlands. The approval facilitates the expansion of data center capacity in the Dutch market.

  • 12 Jan 2024Permit filed

    Datacenter Agriport files permit for cooling water purification upgrade in Middenmeer

    Datacenter Agriport AMS13 and AMS14 in Middenmeer, Netherlands, filed a permit application (prb-2024-531) on January 12, 2024, to modify their cooling water purification process to achieve carbon neutrality. The permit request concerns facilities at Cultuurweg 11 and addresses environmental compliance through an upgrade to their water treatment methodology. This filing represents a sustainability-focused infrastructure change at a major Dutch data-center facility.

  • 20 Apr 2023Permit approved

    Permit Approved for Datacenter Agriport AMS13 and AMS14 in Middenmeer

    Dutch official publication (prb-2023-4496) granted permission to construct datacenters AMS13 and AMS14 at Cultuurweg 11, Middenmeer on the Agriport site. This permit approval marks a regulatory milestone for the facility development. The approval was issued on 20 April 2023 by Dutch authorities.

  • 22 Jul 2022Permit filed

    Fire safety permit filed for AMS 13-14 data center construction in Middenmeer

    An official fire safety notice (gmb-2022-434683) was filed on July 22, 2022 for temporary use of accommodation supporting construction of data center AMS 13-14 located at Cultuurweg 9 in Middenmeer, Netherlands. The filing was registered with local authorities on September 29, 2022. This represents a regulatory milestone in the permitting phase for the facility's development.

All recent activity

Questions about Middenmeer (Agriport A7)

How many data centres are in Middenmeer (Agriport A7)?
There are 3 data centres in Middenmeer (Agriport A7), Netherlands, 2 operators, 2 operational, 310 MW live (100% modelled), 360 MW total potential. Microsoft alone accounts for 2 sites, ahead of Google.
How much data centre capacity does Middenmeer (Agriport A7) have?
DC Atlas tracks 3 data centres in the Middenmeer (Agriport A7) data centre market. 310 MW is live, 50 MW is planned, for 360 MW of total potential at full buildout.
Who are the largest data centre operators in Middenmeer (Agriport A7)?
2 operators run facilities in the Middenmeer (Agriport A7) data centre market. Microsoft is the largest by total potential, with 2 sites and 230 MW.
Which utilities supply power to data centres in Middenmeer (Agriport A7)?
Liander serve the most data centre sites in the Middenmeer (Agriport A7) data centre market. DC Atlas holds a named power supplier for 100% of the facilities it tracks here.

Every data centre we track in Middenmeer (Agriport A7)

3 facilities

Other markets in Netherlands