Market
Vienna: 19 data centres, 13 operators, 165 MW live
There are 19 data centres in Vienna, Austria, 13 operators, 18 operational, 165 MW live (8% modelled), 175 MW total potential. Digital Realty alone accounts for 5 sites, ahead of eww ITandTEL.
Map of 9 data centres in Vienna
Every Vienna site DC Atlas tracks with a position on record, coloured by status.
Vienna is one scope of the whole corpus. See every facility DC Atlas tracks on the global data center map.
Live
165MW
8% modelled
Under construction
0MW
Planned
10MW
Total potential
175MW
Who supplies the power
95% of the data centres we track in the Vienna market have a named power supplier
- Wiener Netze17sites
- Wien Energie1site
Who is building in Vienna
The 10 largest operators here by total potential, of 13 tracked in this market.
| Operator | Sites | Live | Total potential |
|---|---|---|---|
| Digital Realty | 5 | 50 MW | 50 MW |
| eww ITandTEL | 1 | 20 MW | 20 MW |
| Nessus | 2 | 16 MW | 16 MW |
| Interxion | 1 | 15 MW | 15 MW |
| NTT Global Data Centers | 1 | 15 MW | 15 MW |
| Raiffeisen Informatik | 1 | 14 MW | 14 MW |
| AtlasEdge | 2 | 1.6 MW | 12 MW |
| Claro | 1 | 10 MW | 10 MW |
| MadeIT | 1 | 10 MW | 10 MW |
| A1 Telekom Austria | 1 | 5.4 MW | 5.4 MW |
When Vienna was built
121 MW of the live capacity here carries a commissioning date — 61% of the operational sites in this market.
Recent activity
8 recorded developments in the Vienna market, the latest on 12 Mar 2020.
Vienna Digital Realty 002 ownership change
Vienna Digital Realty 002 changed ownership as part of a transaction on 12 March 2020.
Vienna Digital Realty 005 ownership change
Vienna Digital Realty 005 changed ownership on 12 March 2020, when Digital Realty completed the Interxion Combination after having obtained control of Interxion on 9 March 2020.
Vienna Digital Realty 004 — changed ownership
March 12, 2020 for total equity consideration of approximately $7.0
Vienna Digital Realty 003 — changed ownership
We obtained control of Interxion on March 9, 2020 and completed the Interxion Combination on March 12, 2020
Vienna Digital Realty 004 commissioned
Vienna Digital Realty 004 came into service in 2014; the source states it was Vienna-2, targeted for the fourth quarter of 2014.
Vienna Digital Realty 003 commissioned
Vienna Digital Realty 003 came into service in September 2000; the source lists it as Vienna-1, opening in the third quarter of 2000.
Vienna Digital Realty 002 commissioned
Vienna Digital Realty 002 came into service in 2000, according to a table entry recording Vienna-1's opening in the third quarter of 2000 alongside a figure of 4,700.
Vienna Digital Realty 005 commissioned
Vienna Digital Realty 005 came into service in 2000; the source lists it as Vienna-1, Third Quarter, 2000.
Questions about Vienna
- How many data centres are in Vienna?
- There are 19 data centres in Vienna, Austria, 13 operators, 18 operational, 165 MW live (8% modelled), 175 MW total potential. Digital Realty alone accounts for 5 sites, ahead of eww ITandTEL.
- How much data centre capacity does Vienna have?
- DC Atlas tracks 19 data centres in the Vienna data centre market. 165 MW is live, 10 MW is planned, for 175 MW of total potential at full buildout.
- Who are the largest data centre operators in Vienna?
- 13 operators run facilities in the Vienna data centre market. Digital Realty is the largest by total potential, with 5 sites and 50 MW.
- Which utilities supply power to data centres in Vienna?
- Wiener Netze and Wien Energie serve the most data centre sites in the Vienna data centre market. DC Atlas holds a named power supplier for 95% of the facilities it tracks here.
Every data centre we track in Vienna
10 of 19 with a published page