Back to Facilities

Market

Telesystem in Toledo (Ohio): 0.5 MW live

2 facilities · 2 operators

DC Atlas holds 2 data centres in Toledo (Ohio), United States, operated by Telesystem, 0.5 MW live.

Live

0.5MW

Under construction

180MW

Planned

0MW

Total potential

181MW

DC Atlas holds no commissioning date for any of the 1 live facility here, so there is no build history to chart.

Who is hiring in Toledo (Ohio)

1 open data centre role at 1 operator we track

T5 Data Centers is the only operator recruiting in Toledo (Ohio), with 1 role open across 1 discipline. The single role is critical facilities, which runs an estate rather than builds one. It was posted in the last 30 days.

The mix

  • critical facilities1

The roles behind those numbers

Most recently opened

  • T5 Data Centerscritical facilities3 Sept 2026

Counted from the operators' own public careers feeds, read daily. A role counts here when the employer runs a data centre we track and the work is operational rather than back office. What these roles involve, and what they pay.

Questions about Toledo (Ohio)

How many data centres are in Toledo (Ohio)?
DC Atlas holds 2 data centres in Toledo (Ohio), United States, operated by Telesystem, 0.5 MW live.
How much data centre capacity does Toledo (Ohio) have?
DC Atlas tracks 2 data centres in the Toledo (Ohio) data centre market. 0.5 MW is live, 180 MW is under construction, for 181 MW of total potential at full buildout.
Who are the largest data centre operators in Toledo (Ohio)?
2 operators run facilities in the Toledo (Ohio) data centre market. Meta is the largest by total potential, with 1 site and 180 MW.

Every data centre we track in Toledo (Ohio)

1 of 2 with a published page