Tulsa: 11 sites, 6 operators, 102 MW under construction
Of the 11 data centres DC Atlas tracks in Tulsa, United States, 5 are operational, run by 6 operators, 79 MW live (89% modelled), 102 MW under construction. Google alone accounts for 4 sites, ahead of CoreWeave.
Map of 11 data centres in Tulsa
Every Tulsa site DC Atlas tracks with a position on record, coloured by status.
Tulsa is one scope of the whole corpus. See every facility DC Atlas tracks on the global data center map.
Live
79MW
89% modelled
Under construction
102MW
Planned
700MW
Total potential
881MW
Who supplies the power
45% of the data centres we track in the Tulsa market have a named power supplier
- AEP2sites
- Grand River Dam Authority (GRDA)1site
- OG&E1site
- Public Service Company of Oklahoma1site
Who is building in Tulsa
The 6 largest operators here by total potential, of 6 tracked in this market.
Only 60% of the live facilities here carry a commissioning date across too few years, which is too thin to chart as a build history.
Recent activity
4 recorded developments in the Tulsa market, the latest on 30 Sept 2024.
Core Scientific Expands HPC Infrastructure with 100MW Muskogee Data Center
Core Scientific announced progress on infrastructure expansion projects in September 2024, including commencement of substation work at its Muskogee, Oklahoma site to support a planned 100-megawatt high-performance computing data center. The company also reported on-schedule finalization of a 100-megawatt bitcoin mining expansion at its Pecos, Texas facility. The company operated approximately 198,000 bitcoin miners across eight data centers and earned 345 self-mined bitcoin in September while hosting 22,000 customer-owned miners.
Core Scientific Files S-1/A; Plans 500MW Muskogee Data Center
Core Scientific, a Bitcoin and Ethereum mining company, filed an amended S-1 registration statement ahead of its IPO. The company operates six fully operational data centers across North Carolina, Georgia, North Dakota, and Kentucky with 606MW capacity as of June 30, 2022. Core Scientific announced plans for a seventh facility in Denton, Texas (22MW operating, 300MW total when complete) and an agreement with the Muskogee City-County Port Authority to develop a 500MW data center in Oklahoma.
Core Scientific to Build 500 MW Data Center in Muskogee, Oklahoma
Core Scientific announced a partnership with the Muskogee City-County Port Authority to develop a 500 MW data center at the Port of Muskogee John T. Griffin Industrial Park in Oklahoma. The facility will be developed in phases with initial operations beginning in late 2022 and completion expected in 2023. Core Scientific will employ its proprietary Minder fleet management software to enable grid stability through demand curtailment, and the project is expected to create dozens of high-tech jobs.
Sabre Holdings to Divest Data Centers and IT Assets to EDS
Sabre Holdings Corp filed an 8-K on March 15, 2001, announcing the divestiture of approximately $778 million in data center and IT infrastructure assets to EDS. The transaction includes Sabre's Tulsa, Oklahoma data center, outsourcing contracts with major airlines (American Airlines, US Airways, Gulf Air) and Dollar/Thrifty Rent-A-Car, plus desktop and mid-range computer management systems. Following the sale, EDS will provide managed IT services including data center operations, ASP, web site systems, and applications development under a separate outsourcing agreement.
Who is hiring in Tulsa
4 open data centre roles at 1 operator we track
Crusoe is the only operator recruiting in Tulsa, with 4 roles open across 2 disciplines. Every one of the 4 is build-side, design and engineering the largest at 2. Nothing here is being staffed to run. More than half of them, 2 of the 4, were posted in the last 30 days.
- Crusoe4roles
The mix
- design and engineering2
- project management2
The roles behind those numbers
Most recently opened
- Crusoeproject management16 Sept 2026
- Crusoeproject management15 Sept 2026
- Crusoedesign and engineering22 Jun 2026
- Crusoedesign and engineering11 Jun 2026
Counted from the operators' own public careers feeds, read daily. A role counts here when the employer runs a data centre we track and the work is operational rather than back office. What these roles involve, and what they pay.
Questions about Tulsa
- How many data centres are in Tulsa?
- Of the 11 data centres DC Atlas tracks in Tulsa, United States, 5 are operational, run by 6 operators, 79 MW live (89% modelled), 102 MW under construction. Google alone accounts for 4 sites, ahead of CoreWeave.
- How much data centre capacity does Tulsa have?
- DC Atlas tracks 11 data centres in the Tulsa data centre market. 79 MW is live, 102 MW is under construction, 700 MW is planned, for 881 MW of total potential at full buildout.
- Who are the largest data centre operators in Tulsa?
- 6 operators run facilities in the Tulsa data centre market. Google is the largest by total potential, with 4 sites and 770 MW.
- Which utilities supply power to data centres in Tulsa?
- AEP, Grand River Dam Authority (GRDA) and OG&E serve the most data centre sites in the Tulsa data centre market. DC Atlas holds a named power supplier for 45% of the facilities it tracks here.
Every data centre we track in Tulsa
11 facilities
Google4
Tierpoint2
CoreWeave1
Lumen Technologies1
Meta1
TierPoint1
Windstream1
Other markets in United States
- Northern Virginia314
- Southern Ohio (Piketon)1
- West Texas12
- Columbus65
- Atlanta91
- Dallas/Fort Worth129
- Chicago123
- North Louisiana (Richland Parish)2
- Phoenix70
- Charlotte33
- El Paso / Santa Teresa7
- Savannah1
- Richmond20
- South Bend / New Carlisle9
- Columbia Basin (Oregon)48
- Texas Panhandle3
- Milwaukee15
- Northern California120
- Amarillo3
- Des Moines15
- Susquehanna Valley (Berwick)2
- Augusta / Aiken3
- Salt Lake City31
- Detroit26