Market
Austin: 30 data centres, 16 operators, 482 MW live
There are 30 data centres in Austin, United States, 16 operators, 27 operational, 482 MW live (1% modelled), 832 MW total potential. Largest by total potential: Amazon (1 site), then Data Foundry.
Map of 28 data centres in Austin
Every Austin site DC Atlas tracks with a position on record, coloured by status.
Austin is one scope of the whole corpus. See every facility DC Atlas tracks on the global data center map.
Live
482MW
1% modelled
Under construction
2MW
Planned
336MW
Total potential
832MW
Who supplies the power
93% of the data centres we track in the Austin market have a named power supplier
- Austin Energy24sites
- Oncor3sites
- Blue Bonnet Electric Cooperative1site
Who is building in Austin
The 10 largest operators here by total potential, of 16 tracked in this market.
| Operator | Sites | Live | Total potential |
|---|---|---|---|
| Amazon | 1 | — | 336 MW |
| Data Foundry | 8 | 210 MW | 210 MW |
| Sabey Data Centers | 1 | 84 MW | 84 MW |
| Skybox Datacenters | 2 | 60 MW | 60 MW |
| CyrusOne | 3 | 51 MW | 51 MW |
| Switch | 1 | 24 MW | 24 MW |
| Lumen | 3 | 20 MW | 22 MW |
| Digital Realty | 1 | 16 MW | 16 MW |
| Innova Solutions | 1 | — | 10 MW |
| Element Critical | 1 | 7 MW | 7 MW |
When Austin was built
361 MW of the live capacity here carries a commissioning date — 56% of the operational sites in this market.
Recent activity
17 recorded developments in the Austin market, the latest on 27 Aug 2026.
Permit applications filed for four data center buildings in Cedar Creek, Texas
Permit applications have been filed for four additional data center buildings at Cedar Creek, Texas.
Austin City Council votes to regulate data centers
Austin City Council unanimously approved a resolution on August 27 to begin creating a regulatory framework for data centers, including updates to the land development code and requirements for water use, energy use, noise, and lighting. The council mandated binding regulations by end of 2026, with plans to ban larger data centers and freeze approvals of new projects exceeding 20 megawatts or 85 million gallons of water annually until policy is finalized.
Austin County residents protest CleanSpark data center in Sealy
Dozens of Austin County residents gathered on August 15, 2026, at a CleanSpark community meeting in Sealy, Texas to protest a proposed 285-megawatt data center. Residents arrived in tractors, trailers and trucks to voice concerns about impacts including water use, noise, light pollution, and effects on migratory birds. CleanSpark stated the facility would use only 10 acres of a 270-acre property, employ a closed-loop cooling system, and generate millions in tax revenue. The protest comes days after Governor Greg Abbott announced data-centre compliance standards for Google, Rowan and CleanSpark.
Dynamix Capital closes $95m Batch Zero fund for Texas AI data centre power
Dynamix Capital Partners closed a $95 million fund to cover ERCOT Batch Zero deposits, backing 1.7 GW of Texas AI data centre capacity near Austin and Dallas.
CoreWeave to lease capacity from EdgeConneX at Cedar Creek data center campus in Texas
CoreWeave will lease capacity from EdgeConneX at a data center campus located in Cedar Creek, Texas.
Core Scientific expands HPC hosting with CoreWeave partnership and 230 MW infrastructure
Core Scientific announced an expansion of its HPC hosting business through an agreement with CoreWeave, including delivery of an Austin data center ahead of schedule. CoreWeave will fund an estimated $105 million in capital investments to convert Core Scientific's existing infrastructure into application-specific data centers (ASDCs) customized for dense HPC workloads. The expansion includes an option for approximately 230 MW of additional HPC hosting infrastructure across other Core Scientific sites, potentially positioning the company among the largest U.S. data center operators with 1.2 gigawatts of total contracted power.
Core Scientific Reports 20.4 EH/s Bitcoin Mining Capacity and GPU Hosting Expansion
Core Scientific disclosed operational metrics as of May 31, 2024, including operation of ~173,000 owned bitcoin miners producing 20.4 EH/s of hash rate and ~51,000 client-owned miners producing 5.7 EH/s. The company is expanding high-performance computing capacity by hosting CoreWeave's NVIDIA servers at a 16MW data center in Austin, Texas, with plans to host thousands more GPUs for HPC and AI workloads. Core Scientific operates eight data centers across five U.S. states with proprietary fleet and energy management technologies.
Core Scientific partners with CoreWeave for GPU infrastructure
Core Scientific entered into a multi-year contract with CoreWeave to provide up to 16 MW of data center infrastructure at an upgraded Austin, TX facility formerly occupied by HP. The partnership builds on Core Scientific's existing hosting relationship with CoreWeave dating to 2019 and leverages the company's data center expertise and assets across more than 300 MW of infrastructure positioned near major cities. The contract is valued at over $100 million across its multi-year term and demonstrates Core Scientific's expansion into GPU hosting for AI workloads.
Who is hiring in Austin
3 open data centre roles at 3 operators we track
3 operators are recruiting in Austin, 3 roles in total, the largest of them EdgeConnex at 1. The split is 2 build-side to 1 operational, with critical facilities (1) and design and engineering (1) the two largest disciplines.
- EdgeConnex1role
- Element Critical1role
- T5 Data Centers1role
The mix
- critical facilities1
- design and engineering1
- project management1
The roles behind those numbers
Most recently opened
- EdgeConnexdesign and engineering2 Jun 2026
- T5 Data Centersproject management5 May 2026
- Element Criticalcritical facilities1 May 2026
Counted from the operators' own public careers feeds, read daily. A role counts here when the employer runs a data centre we track and the work is operational rather than back office. What these roles involve, and what they pay.
Questions about Austin
- How many data centres are in Austin?
- There are 30 data centres in Austin, United States, 16 operators, 27 operational, 482 MW live (1% modelled), 832 MW total potential. Largest by total potential: Amazon (1 site), then Data Foundry.
- How much data centre capacity does Austin have?
- DC Atlas tracks 30 data centres in the Austin data centre market. 482 MW is live, 2 MW is under construction, 336 MW is planned, for 832 MW of total potential at full buildout.
- Who are the largest data centre operators in Austin?
- 16 operators run facilities in the Austin data centre market. Amazon is the largest by total potential, with 1 site and 336 MW.
- Which utilities supply power to data centres in Austin?
- Austin Energy, Oncor and Blue Bonnet Electric Cooperative serve the most data centre sites in the Austin data centre market. DC Atlas holds a named power supplier for 93% of the facilities it tracks here.
Every data centre we track in Austin
28 of 30 with a published page
Data Foundry9
CyrusOne3
Lumen3
LightEdge2
LOGIX2
Skybox Datacenters2
American Tower1
AWS1
Cogent1
DataBank1
Digital Realty1
Element Critical1
Sabey Data Centers1
Other markets in United States
- Northern Virginia314
- Southern Ohio (Piketon)1
- West Texas12
- Columbus65
- Atlanta91
- Dallas/Fort Worth129
- Chicago123
- North Louisiana (Richland Parish)2
- Phoenix70
- Charlotte33
- El Paso / Santa Teresa7
- Savannah1
- Richmond20
- South Bend / New Carlisle9
- Columbia Basin (Oregon)48
- Texas Panhandle3
- Milwaukee15
- Northern California120
- Amarillo3
- Des Moines15
- Susquehanna Valley (Berwick)2
- Augusta / Aiken3
- Salt Lake City31
- Detroit26